Composite multilinearity, epistemic uncertainty and risk achievement worth

Risk achievement worth is one of the most widely utilized importance measures. RAW is defined as the ratio of the risk metric value attained when a component has failed over the base case value of the risk metric. Traditionally, both the numerator and denominator are point estimates. Relevant literature has shown that inclusion of epistemic uncertainty (i) induces notable variability in the point estimate ranking and (ii) causes the expected value of the risk metric to differ from its nominal value. We investigate the conditions under which the equality of the nominal and expected values of a reliability risk metric holds. We then study how the presence of epistemic uncertainty affects RAW and the associated ranking. We propose an extension of RAW (called ERAW) which allows one to obtain a ranking robust to epistemic uncertainty. We discuss the properties of ERAW and the conditions under which it coincides with RAW. We apply our findings to a probabilistic risk assessment model developed for the safety analysis of NASA lunar space missions.

[1]  Emanuele Borgonovo,et al.  What drives value creation in investment projects? An application of sensitivity analysis to project finance transactions , 2010, Eur. J. Oper. Res..

[2]  Robert F. Bordley,et al.  Multiattribute Preference Analysis with Performance Targets , 2004, Oper. Res..

[3]  M. Cheok,et al.  Use of importance measures in risk-informed regulatory applications , 1998 .

[4]  Seth D Guikema,et al.  On the limitations of redundancies in the improvement of system reliability. , 2004, Risk analysis : an official publication of the Society for Risk Analysis.

[5]  J. B. Fussell HowtoHand-Calculate System Reliability andSafety Characteristics , 1975 .

[6]  Curtis Smith,et al.  Key attributes of the SAPHIRE risk and reliability analysis software for risk-informed probabilistic applications , 2008, Reliab. Eng. Syst. Saf..

[7]  Curtis Smith Calculating Conditional Core Damage Probabilities for Nuclear Power Plant Operations Reliability Eng , 1998 .

[8]  Gordon Hazen,et al.  Javelin Diagrams: A Graphical Tool for Probabilistic Sensitivity Analysis , 2004, Decis. Anal..

[9]  Joseph H. Saleh,et al.  On the value of redundancy subject to common-cause failures: Toward the resolution of an on-going debate , 2009, Reliab. Eng. Syst. Saf..

[10]  Emanuele Borgonovo,et al.  The reliability importance of components and prime implicants in coherent and non-coherent systems including total-order interactions , 2010, Eur. J. Oper. Res..

[11]  Didier Dubois,et al.  Decision-theoretic foundations of qualitative possibility theory , 2001, Eur. J. Oper. Res..

[12]  Jin Zhang,et al.  Methodology for determining the acceptability of system designs in uncertain environments , 2011, Eur. J. Oper. Res..

[13]  R. Iman,et al.  A measure of top-down correlation , 1987 .

[14]  José María Alonso-Meijide,et al.  Computing power indices: Multilinear extensions and new characterizations , 2008, Eur. J. Oper. Res..

[15]  Emanuele Borgonovo,et al.  A new importance measure for risk-informed decision making , 2001, Reliab. Eng. Syst. Saf..

[16]  Adnan Darwiche,et al.  A differential semantics for jointree algorithms , 2002, Artif. Intell..

[17]  Christophe Bérenguer,et al.  From differential to difference importance measures for Markov reliability models , 2010, Eur. J. Oper. Res..

[18]  Emanuele Borgonovo,et al.  Epistemic Uncertainty in the Ranking and Categorization of Probabilistic Safety Assessment Model Elements: Issues and Findings , 2008, Risk analysis : an official publication of the Society for Risk Analysis.

[19]  J. B. Fussell,et al.  How to Hand-Calculate System Reliability and Safety Characteristics , 1975, IEEE Transactions on Reliability.

[20]  Christodoulos A. Floudas,et al.  A review of recent advances in global optimization , 2009, J. Glob. Optim..

[21]  Didier Dubois,et al.  Representation, Propagation, and Decision Issues in Risk Analysis Under Incomplete Probabilistic Information , 2010, Risk analysis : an official publication of the Society for Risk Analysis.

[22]  G. Apostolakis The concept of probability in safety assessments of technological systems. , 1990, Science.

[23]  M. Elisabeth Paté-Cornell,et al.  Uncertainties in risk analysis: Six levels of treatment , 1996 .

[24]  Scott D. Sagan,et al.  The Problem of Redundancy Problem: Why More Nuclear Security Forces May Produce Less Nuclear Security † , 2004, Risk analysis : an official publication of the Society for Risk Analysis.

[25]  Terje Aven,et al.  On the Need for Restricting the Probabilistic Analysis in Risk Assessments to Variability , 2010, Risk analysis : an official publication of the Society for Risk Analysis.

[26]  Homayoon Dezfuli,et al.  Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition) , 2011 .

[27]  Jean-Luc Marichal,et al.  Weighted Banzhaf power and interaction indexes through weighted approximations of games , 2010, Eur. J. Oper. Res..

[28]  T. Saaty Highlights and critical points in the theory and application of the Analytic Hierarchy Process , 1994 .

[29]  David W. Coit,et al.  Composite importance measures for multi-state systems with multi-state components , 2005, IEEE Transactions on Reliability.

[30]  Christophe Labreuche,et al.  On the extension of pseudo-Boolean functions for the aggregation of interacting criteria , 2003, Eur. J. Oper. Res..

[31]  Jack P. C. Kleijnen,et al.  Methodology for Determining the Acceptability of Given Designs in Uncertain Environments , 2009 .

[32]  B J Garrick,et al.  Interval Analysis Versus Probabilistic Analysis , 2010, Risk analysis : an official publication of the Society for Risk Analysis.

[33]  Ali Mosleh Common cause failures: An analysis methodology and examples , 1991 .

[34]  Emanuele Borgonovo,et al.  A Study of Interactions in the Risk Assessment of Complex Engineering Systems: An Application to Space PSA , 2011, Oper. Res..

[35]  S. Kaplan,et al.  On The Quantitative Definition of Risk , 1981 .

[36]  Seth D. Guikema,et al.  Programmatic Risk Analysis for Critical Engineering Systems Under Tight Resource Constraints , 2003, Oper. Res..

[37]  Lirong Cui,et al.  Analysis for joint importance of components in a coherent system , 2007, Eur. J. Oper. Res..

[38]  G. Apostolakis,et al.  Pitfalls in risk calculations , 1981 .

[39]  Juan J. Gonzalez,et al.  A comparison of two interactive MCDM procedures , 1989 .

[40]  George Apostolakis,et al.  The foundations of models of dependence in probabilistic safety assessment , 1987 .