BIM for infrastructure: an efficient process to achieve 4D and 5D digital dimensions
暂无分享,去创建一个
Fabrizio D'Amico | Fabio Tosti | Chiara Ferrante | Luca D’Ascanio | Maria Chiara De Falco | Presta Davide
[1] Jack Chin Pang Cheng,et al. A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM) , 2016 .
[2] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[3] Xiangyu Wang,et al. Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects , 2016 .
[4] Song Wu,et al. nD modelling road map : A vision for nD-Enabled construction , 2005 .
[5] David Mitchell. 5D BIM: CREATING COST CERTAINTY AND BETTER BUILDINGS , 2012 .
[6] Wei-Chih Wang,et al. Integrating building information models with construction process simulations for project scheduling support , 2014 .
[7] Petr Matejka,et al. Comparison of different cost estimation methods with use of Building Information Modelling (BIM) , 2018 .
[8] Zhen-Zhong Hu,et al. BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies , 2011 .
[9] Rafael Sacks,et al. A review of building information modeling protocols, guides and standards for large construction clients , 2016, J. Inf. Technol. Constr..