Short time-step performances of coaxial and double U-tube borehole heat exchangers: Modeling and measurements

Several authors have investigated the long time-step performance of borehole heat exchangers. In that time scale, the borehole thermal capacitance is generally neglected, since the time span of interest is on the order of months or years. The borehole thermal capacitance consists both of grouting material and heat carrier fluid, and it mostly affects the short time-step behavior, when hourly or shorter time intervals are considered. Some models are available in the literature for short time-step simulations of borehole heat exchangers. In this article, short time-step analyses of coaxial and double U-tube heat exchangers are performed by means of numerical capacity resistance model. The capacity resistance model is compared with field measurements, analytical solutions available in the literature, and commercial software based on the finite-element method. Further comparisons between coaxial and common double U-tube heat exchangers are carried out by means of measurements performed in a suitable plant system. Furthermore, the series and parallel arrangements for double U-tube heat exchangers are investigated considering the borehole thermal capacitance.

[1]  L. Lamarche,et al.  New solutions for the short-time analysis of geothermal vertical boreholes , 2007 .

[2]  D. Marcotte,et al.  On the estimation of thermal resistance in borehole thermal conductivity test , 2008 .

[3]  Hongxing Yang,et al.  Numerical analysis and experimental validation of heat transfer in ground heat exchangers in alternative operation modes , 2008 .

[4]  G. Hellström,et al.  Multipole method to compute the conductive heat flows to and between pipes in a composite cylinder , 1987 .

[5]  Thomas Oppelt,et al.  Modelling of the borehole filling of double U-pipe heat exchangers , 2010 .

[6]  F. Dittus,et al.  Heat transfer in automobile radiators of the tubular type , 1930 .

[7]  Louis Lamarche,et al.  A new contribution to the finite line-source model for geothermal boreholes , 2007 .

[8]  Frédéric Kuznik,et al.  Numerical modelling of geothermal vertical heat exchangers for the short time analysis using the state model size reduction technique , 2010 .

[9]  V. C. Mei,et al.  Theoretical and experimental analysis of vertical, concentric-tube ground-coupled heat exchangers , 1984 .

[10]  L. Rosenhead Conduction of Heat in Solids , 1947, Nature.

[11]  E. Schlunder,et al.  VDI Heat Atlas , 1993 .

[12]  Michele De Carli,et al.  Short time step analysis of vertical ground-coupled heat exchangers: The approach of CaRM , 2011 .

[13]  Per Eskilson Thermal analysis of heat extraction boreholes , 1987 .

[14]  Z. Fang,et al.  A finite line‐source model for boreholes in geothermal heat exchangers , 2002 .

[15]  Gopal Bandyopadhyay,et al.  Analytical and semi-analytical solutions for short-time transient response of ground heat exchangers , 2008 .

[16]  Jonathan A. Wright,et al.  Modeling the Dynamic Response of Conduits , 2002 .

[17]  S. Gehlin Thermal response test : method development and evaluation , 2002 .

[18]  Jeffrey D. Spitler,et al.  A short time step response factor model for vertical ground loop heat exchangers , 1999 .

[19]  Stanislaw Kajl,et al.  A review of methods to evaluate borehole thermal resistances in geothermal heat-pump systems , 2010 .

[20]  Johan Claesson,et al.  Conductive heat extraction to a deep borehole: Thermal analyses and dimensioning rules , 1988 .

[21]  Z. Fang,et al.  Heat transfer analysis of boreholes in vertical ground heat exchangers , 2003 .

[22]  O. J. Zobel,et al.  Heat conduction with engineering and geological applications , 1948 .

[23]  Michele De Carli,et al.  A computational capacity resistance model (CaRM) for vertical ground-coupled heat exchangers , 2010 .