Methodology to Estimate User Costs in Indiana Bridge Management System
暂无分享,去创建一个
[1] Yi Jiang,et al. The development of optimal strategies for maintenance, rehabilitation and replacement of highway bridges, final report vol 6: performance analysis and optimization , 1989 .
[2] S E Lipkus. BRIDGIT - BRIDGE MANAGEMENT SYSTEM SOFTWARE , 1993 .
[3] Kumares C. Sinha,et al. The development of optimal strategies for maintenance, rehabilitation and replacement of highway bridges, final report vol 3: bridge traffic safety evaluation , 1989 .
[4] Kumares C. Sinha,et al. THE DEVELOPMENT OF A PROTOTYPE CONGESTION MANAGEMENT SYSTEM FOR THE STATE OF INDIANA: PHASE I. FINAL REPORT , 1994 .
[5] B D Greenshields,et al. A study of traffic capacity , 1935 .
[6] Cong Chen. BRIDGE MANAGEMENT UNDER A LEVEL OF SERVICE CONCEPT PROVIDING OPTIMUM IMPROVEMENT ACTION, TIME, AND BUDGET PREDICTION , 1987 .
[7] Kumares C. Sinha,et al. The development of optimal strategies for maintenance, rehabilitation and replacement of highway bridges, final report vol 4: cost analysis , 1989 .