Concrete Pressure Pipe

will cover superimposed and live loads. It is hoped that this manual will give the engineer all the information needed to design a pipeline using asbestoscement pipe. In summary, experience with asbestos-cement pipe d signed on a hydrostatic test basis alone has provided long-time trouble-free service in the field. Conversion of this design approach to the performance curve approach is needed. This approach will enable engineers to pinpoint design of asbestos-cement pipe and will give them information on the product that has not been available in the past.