Accelerator Magnet RD in the Perspective of a LHeC and HE-LHC - Synergy or Competion?
暂无分享,去创建一个
Bernhard Auchmann | Davide Tommasini | Ezio Todesco | Stephan Russenschuck | Paolo Ferracin | Marta Bajko | Paolo Fessia | G. de Rijk | Lucio Rossi | L. Bottura | Mikko Karppinen | F. Borgnolutti | Jimena Perez | G. Kirby | D. Smekens | L. Oberli | A. Ballarino
[1] Lucio Rossi,et al. DEVELOPMENT OF NB3SN 11 T SINGLE APERTURE DEMONSTRATOR DIPOLE FOR LHC UPGRADES , 2011 .
[2] P Fessia,et al. Mechanical Design of the SMC (Short Model Coil) Dipole Magnet , 2010, IEEE Transactions on Applied Superconductivity.
[3] A Ballarino,et al. Alternative Design Concepts for Multi-Circuit HTS Link Systems , 2011, IEEE Transactions on Applied Superconductivity.
[4] L. Rossi,et al. Conceptual design of 20 T dipoles for high-energy LHC , 2011, 1108.1619.
[5] Amalia Ballarino,et al. Conceptual Design of the LHC Interaction Region Upgrade - Phase-I , 2008 .
[6] F Zimmermann. LHeC and HE-LHC: Accelerator Lay-out and Challenges , 2012 .
[7] P. Fabbricatore,et al. Development of a Curved Fast Ramped Dipole for FAIR SIS300 , 2008, IEEE Transactions on Applied Superconductivity.
[8] P. Vedrine,et al. Overview and status of the Next European Dipole Joint Research Activity , 2006 .
[9] P Fessia,et al. A 120 mm Bore Quadrupole for the Phase I LHC Upgrade , 2010, IEEE Transactions on Applied Superconductivity.
[10] Shlomo Caspi,et al. The use of pressurized bladders for stress control of superconducting magnets , 2001 .
[11] T. Boutboul,et al. Heat Treatment Optimization Studies on PIT ${\rm Nb}_{3}{\rm Sn}$ Strand for the NED Project , 2009, IEEE Transactions on Applied Superconductivity.
[12] Paolo Ferracin,et al. Test results of TQS03: A LARP shell-based Nb3Sn quadrupole using 108/127 conductor , 2010 .
[13] P. Vedrine,et al. Design and Test of a ${\hbox{Nb}}_{3}{\hbox{Sn}}$ Subscale Dipole Magnet for Training Studies , 2007, IEEE Transactions on Applied Superconductivity.
[14] D. Kramer,et al. Design Status of the FAIR Synchrotrons SIS100 and SIS300 and the High Energy Beam Transport System , 2008 .
[15] J. Genest,et al. 1.9 K test facility for the reception of the superconducting cables for the LHC , 1999, IEEE Transactions on Applied Superconductivity.
[16] Lucio Rossi,et al. LHC UPGRADE PLANS: OPTIONS AND STRATEGY , 2011 .
[17] GianLuca Sabbi,et al. New Magnets for the IR: how far are we from the HL-LHC target? , 2012 .
[18] F. Zomer,et al. A Large Hadron Electron Collider at CERN: Report on the Physics and Design Concepts for Machine and Detector , 2012, 1206.2913.
[19] S. Russenschuck,et al. Engineering Design and Manufacturing Challenges for a Wide-Aperture, Superconducting Quadrupole Magnet , 2012, IEEE Transactions on Applied Superconductivity.
[20] Michael Benedikt,et al. DESIGN OPTIMIZATION OF PS2 , 2010 .