A Monte Carlo simulation approach to the evaluation of maximum turbine-generator shaft torsional torques during faulty synchronization
暂无分享,去创建一个
[1] G. L. Ford,et al. Analytical methods for probabilistic short-circuit studies , 1982 .
[2] R. Billinton,et al. Probabilistic Assessment of Transient Stability in a Practical Multimachine System , 1981, IEEE Transactions on Power Apparatus and Systems.
[3] Roy Billinton,et al. Stochastic evaluation of turbine-generator shaft torsional torques during faulty synchronisation , 1996 .
[4] Roy Billinton,et al. Stochastic modelling of high-speed reclosing in probabilistic transient stability studies , 1995 .
[5] J.V. Mitsche,et al. Shaft Torsional Stress Due to Asynchronous Faulty Synchronization , 1980, IEEE Transactions on Power Apparatus and Systems.
[6] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[7] A. M. Leite da Silva,et al. Probabilistic load flow techniques applied to power system expansion planning , 1990 .
[8] Barbara Borkowska,et al. Probabilistic Load Flow , 1974 .
[9] G. Orawski,et al. Reliability Based Design of Transmission Lines According to Recent Advances by IEC and CIGRE , 1987 .
[10] M. E. Muller,et al. A Note on the Generation of Random Normal Deviates , 1958 .
[11] E. G. Neudorf,et al. Probabilistic Short-Circuit Uprating of Station Strain Bus System-Overview and Application , 1986, IEEE Transactions on Power Delivery.
[12] N. Ramani,et al. Wind Direction and Extreme Wind Loads for Overhead Power Line Design , 1987 .
[13] R. Billinton,et al. Comprehensive Bibliography On Electrical Service Interruption Costs , 1983, IEEE Transactions on Power Apparatus and Systems.