Building method of filled wall body for gob-side entry retaining of large-inclination coal seam

The invention relates to a building method of a filled wall body for gob-side entry retaining of a large-inclination coal seam, which comprises the following steps: erecting dense individual props on the entry retaining side on the rear part of a heading stope to retain roadway space on the rear part of the heading stope, erecting anti-tilting side supports along the dense individual props, laying reinforcing fabric and high-strength fiber cloth on the side of the dense individual props close to the gob, and building a structure used for intercepting waste rocks in the gob; and when the dropped waste rocks in the gob automatically slide along the large-inclination footwall to the waste rock blocking structure formed by the reinforcing fabric and the high-strength fiber cloth under the effect of the dead weight and pile up to a certain degree, grouting and cementing part of the dropped waste rocks near the entry retaining side for consolidation, thereby forming the filled wall body, and repeating the steps in sequence along with the advancement of the heading stope until the whole filled wall body for gob-side entry retaining. The invention has the advantages of simple method and high working efficiency, the filled wall body built in the method is of high strength and is also economical and practical, and the method is suitable for the building of the filled wall body for gob-side entry retaining under the high-inclination condition.