Outsourcing and production scheduling for a two-stage flow shop
暂无分享,去创建一个
[1] Chris N. Potts,et al. Supply chain scheduling: Batching and delivery , 2003, Oper. Res..
[2] T.C.E. Cheng,et al. Logistics scheduling to minimize inventory and transport costs , 2009 .
[3] Chung-Lun Li,et al. Machine scheduling with deliveries to multiple customer locations , 2005, Eur. J. Oper. Res..
[4] Chung-Yee Lee,et al. Machine scheduling with job delivery coordination , 2004, Eur. J. Oper. Res..
[5] T. C. Edwin Cheng,et al. Single Supplier Scheduling for Multiple Deliveries , 2001, Ann. Oper. Res..
[6] Ik Sun Lee,et al. Single machine scheduling with outsourcing allowed , 2008 .
[7] Chiung Moon,et al. Advanced planning and scheduling with outsourcing in manufacturing supply chain , 2002 .
[8] Jian Yang,et al. A Production-Inventory System with Markovian Capacity and Outsourcing Option , 2005, Oper. Res..
[9] Xiangtong Qi,et al. Coordinated Logistics Scheduling for In-House Production and Outsourcing , 2008, IEEE Transactions on Automation Science and Engineering.
[10] Joseph Y.-T. Leung,et al. Two Machine Scheduling under Disruptions with Transportation Considerations , 2006, J. Sched..
[11] Chris N. Potts,et al. The Coordination of Scheduling and Batch Deliveries , 2005, Ann. Oper. Res..
[12] George L. Vairaktarakis,et al. Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs , 2009, Manuf. Serv. Oper. Manag..
[13] Alper Atamtürk,et al. Capacity Acquisition, Subcontracting, and Lot Sizing , 2001, Manag. Sci..
[14] Milind Dawande,et al. Supply Chain Scheduling: Distribution Systems , 2006 .
[15] George L. Vairaktarakis,et al. Integrated Scheduling of Production and Distribution Operations , 2005, Manag. Sci..
[16] Alessandro Agnetis,et al. Supply chain scheduling: Sequence coordination , 2006, Discret. Appl. Math..
[17] George L. Vairaktarakis,et al. Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..
[18] T. C. Edwin Cheng,et al. Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays , 2004, Ann. Oper. Res..
[19] Zhi-Long Chen,et al. Machine scheduling with transportation considerations , 2001 .
[20] Hua Xuan,et al. A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time , 2006, Comput. Oper. Res..
[21] Chung-Lun Li,et al. Lot streaming with supplier–manufacturer coordination , 2004 .
[22] Xiangtong Qi,et al. A logistics scheduling model: scheduling and transshipment for two processing centers , 2006 .
[23] George L. Vairaktarakis,et al. The use of flowlines to simplify routing complexity in two-stage flowshops , 2000 .
[24] Robert M. Fuhrer,et al. Coordinating Investment, Production, and Subcontracting , 1999 .
[25] Christos Koulamas,et al. A note on makespan minimization in two-stage flexible flow shops with uniform machines , 2006, Eur. J. Oper. Res..
[26] Ceyda Oguz,et al. A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks , 2005, J. Sched..
[27] Michael Pinedo,et al. Planning and Scheduling in Supply Chains: An Overview of Issues in Practice , 2004 .
[28] Xiangtong Qi. A logistics scheduling model: Inventory cost reduction by batching , 2005 .
[29] Ik Sun Lee,et al. Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed , 2008, Eur. J. Oper. Res..
[30] Zhi-Long Chen,et al. Order Assignment and Scheduling in a Supply Chain , 2006, Oper. Res..
[31] James R. Bradley. A Brownian Approximation of a Production-Inventory System with a Manufacturer That Subcontracts , 2004, Oper. Res..
[32] Xiangtong Qi. Two-stage production scheduling with an option of outsourcing from a remote supplier , 2009 .
[33] P. S. Sundararaghavan,et al. Minimizing makespan in parallel flowshops , 1997 .
[34] Jinwoo Park,et al. A new approach to job shop scheduling problems with due date constraints considering operation subcontracts , 2005 .
[35] George L. Vairaktarakis,et al. Optimization of processing and delivery decisions involving third-party machines , 2005 .
[36] Zhi-Long Chen,et al. Scheduling with subcontracting options , 2008 .
[37] Chung Yee Lee,et al. Production and transport logistics scheduling with two transport mode choices , 2005 .