A development of next generation intelligent construction liftcar toolkit for vertical material movement management
暂无分享,去创建一个
[1] Soon-Wook Kwon,et al. Basic Study of Smart Robotic Construction Lift For Increasing Resource Lifting Efficiency in High-Rise Building Construction , 2009 .
[2] Ye Ouyang,et al. The Convergence of RFID with Wi-Fi and on the Applications in Logistics System , 2007 .
[3] Sangyoon Chin,et al. RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings , 2008 .
[4] Carlos H. Caldas,et al. Field experiments of an automated materials identification and localization model , 2007 .
[5] Carlos H. Caldas,et al. Locating Materials on Construction Site Using Proximity Techniques , 2005 .
[6] Kyunghwan Kim,et al. Hoist Scheduling Chart and Lifting Load Leveling Method for Applying JIT(Just-In-Time) in Construction , 2009 .
[7] Liang Y Liu,et al. Real-time construction operation tracking from resource positions , 2007 .
[8] Carlos H. Caldas,et al. Methodology for Automating the Identification and Localization of Construction Components on Industrial Projects , 2009 .
[9] Ahn Byung-Ju. A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation , 2004 .
[10] Carlos H. Caldas,et al. Tracking the Location of Materials on Construction Job Sites , 2006 .
[11] Li Jiang,et al. RFID-Based Vehicle Key Parts Tracking System , 2009 .
[12] Sangyoon Chin,et al. Realtime 4D CAD = RFID for Project Progress Management , 2005 .