A branch and bound algorithm to minimise total weighted tardiness on a single batch processing machine with ready times and incompatible job families
暂无分享,去创建一个
[1] Y. H. Kim,et al. Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals , 2002, Comput. Oper. Res..
[2] Reha Uzsoy,et al. Minimizing total tardiness on a batch processing machine with incompatible job families , 1998 .
[3] T. B. Tate,et al. Machine Scheduling Problems , 1978 .
[4] M. Mathirajan,et al. Scheduling of Batch Processors in Semiconductor Manufacturing – A Review , 2003 .
[5] Reha Uzsoy,et al. A genetic algorithm to minimize maximum lateness on a batch processing machine , 2002, Comput. Oper. Res..
[6] Xiangtong Qi,et al. Earliness and Tardiness Scheduling Problems on a Batch Processor , 1999, Discret. Appl. Math..
[7] Dorit S. Hochbaum,et al. Scheduling Semiconductor Burn-In Operations to Minimize Total Flowtime , 1997, Oper. Res..
[8] C. S. Sung,et al. Minimizing makespan on a single burn-in oven in semiconductor manufacturing , 2000, Eur. J. Oper. Res..
[9] Meral Azizoglu,et al. Scheduling a batch processing machine with non-identical job sizes , 2000 .
[10] R. Uzsoy. Scheduling a single batch processing machine with non-identical job sizes , 1994 .
[11] Reha Uzsoy,et al. Minimizing total tardiness on a batch processing machine with incompatible job families , 1998 .
[12] Clarisse Dhaenens,et al. Minimizing the makespan on a batch machine with non-identical job sizes: an exact procedure , 2002, Comput. Oper. Res..
[13] Joseph Y.-T. Leung,et al. Minimizing Total Tardiness on One Machine is NP-Hard , 1990, Math. Oper. Res..
[14] Chung-Lun Li,et al. Scheduling with agreeable release times and due dates on a batch processing machine , 1997 .
[15] Meral Azizoglu,et al. Scheduling a batch processing machine with incompatible job families , 2001 .
[16] Chris N. Potts,et al. Scheduling with batching: A review , 2000, Eur. J. Oper. Res..
[17] John W. Fowler,et al. Minimizing total weighted tardiness on a single batch process machine with incompatible job families , 2005, Comput. Oper. Res..
[18] Kenneth R. Baker,et al. Scheduling Groups of Jobs on a Single Machine , 1995, Oper. Res..
[19] Scott J. Mason,et al. Minimizing total weighted tardiness on a batch-processing machine with incompatible job families and job ready times , 2008 .
[20] John W. Fowler,et al. Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness , 2004 .
[21] Reha Uzsoy,et al. Scheduling batch processing machines with incompatible job families , 1995 .
[22] Reha Uzsoy,et al. Minimizing total completion time on batch processing machines , 1993 .
[23] John W. Fowler,et al. Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times , 2005, Comput. Oper. Res..
[24] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[25] J. A. Hoogeveen,et al. Scheduling a batching machine , 1998 .