Bibliography on Optimal Reservoir Drawdown for the Hydroelectric-Thermal Power System Operation

This bibliography deals with optimum water management. The references on optimal load flow and thermal power dispatch independent of hydro system have not been included. The bibliography is presented to evolve a discussion on the more recent power system economic operation problems and will be of interest to those involved in the subject of water management research.

[1]  Y. Larsson,et al.  Incremental Cost of Water Power , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[2]  Thomas Kennedy,et al.  Dispatch of Pumped Hydro Storage on an Interconnected Hydrothermal System , 1965 .

[3]  L. Bodin,et al.  Multireservoir Operation Studies , 1970 .

[4]  W. Yeh,et al.  Optimal Timing, Sequencing, and Sizing of Multiple Reservoir Surface Water Supply Facilities , 1974 .

[5]  Myron B. Fiering,et al.  Queuing Theory and Simulation In Reservoir Design , 1961 .

[6]  Y. Ho Differential games, dynamic optimization, and generalized control theory , 1970 .

[7]  Robert J. Ringlee,et al.  Susquehanna River Short-Range Hydrothermal Co-ordination , 1963 .

[8]  Z. Schweig,et al.  Optimal Control of Linked Reservoirs , 1968 .

[9]  Robert A. Young,et al.  Digital computer simulation for solving management problems of conjunctive groundwater and surface water systems , 1972 .

[10]  William S. Butcher,et al.  Optimization of the Operation of a Multiple‐Purpose Reservoir by Dynamic Programming , 1968 .

[11]  Venkateswararao Vemuri,et al.  Multiple-Objective Optimization in Water Resource Systems , 1974 .

[12]  S. Arora,et al.  A Note on Linear Decision Rules , 1970 .

[13]  Nicolaos V. Arvanitidis,et al.  Optimal Operation of Multireservoir Systems Using a Composite Representation , 1970 .

[14]  R. M. Durstine Economic Scheduling of Electric Power Production , 1962 .

[15]  C. C. Bonin Water-Hammer Damage to Oigawa Power Station , 1960 .

[16]  S. Arora,et al.  Optimal Capacities for a Multireservoir System Using the Linear Decision Rule , 1971 .

[17]  L. K. Kirchmayer,et al.  Optimal control of thermal-hydro system operation , 1963 .

[18]  Fereidoun Mobasheri,et al.  a Stochastic Dynamic Programming Model for the Optimum Operation of a Multi-Purpose Reservoir , 1973 .

[19]  Warren H. Hausman,et al.  Sequential Decision Problems: A Model to Exploit Existing Forecasters , 1969 .

[20]  Uri Shamir,et al.  Water Distribution Systems Analysis , 1968 .

[21]  N. Buras,et al.  The dynamic programming approach to water‐resources development , 1961 .

[22]  Harold Allen Thomas,et al.  On the Efficient Use of High Aswan Dam for Hydropower and Irrigation , 1966 .

[23]  K. S. Prakasa Rao,et al.  Optimal scheduling of pumped storage plants by the method of local variations , 1974 .

[24]  M. Ramamoorty,et al.  Load scheduling of hydroelectric/thermal generating systems using nonlinear programming techniques , 1970 .

[26]  B. Bernholtz,et al.  Hydrothermal Economic Scheduling Part IV. A Continuous Procedure for Maximizing the Weighted Output of a Hydroelectric Generating Station , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[27]  D. Jacobson New second-order and first-order algorithms for determining optimal control: A differential dynamic programming approach , 1968 .

[28]  Robert E. Larson,et al.  Dynamic programming applications to water resource system operation and planning , 1968 .

[29]  A. Charnes,et al.  Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints , 1963 .

[30]  T. N. Saha,et al.  An Application of a Direct Method to the Optimal Scheduling of Hydrothermal System , 1978, IEEE Transactions on Power Apparatus and Systems.

[31]  Roy Billinton,et al.  Optimal Real and Reactive Power Operation in a Hydrothermal System , 1972 .

[32]  R. Donachie Digital Program for Water Network Analysis , 1974 .

[33]  H. B. Hamilton,et al.  Optimal Long Range hydro Scheduling in the Integrated Power System , 1978, IEEE Transactions on Power Apparatus and Systems.

[34]  H.H. Happ,et al.  Optimal power dispatchߞA comprehensive survey , 1977, IEEE Transactions on Power Apparatus and Systems.

[35]  N. Buras A Three-Dimensional Optimization Problem in Water-Resources Engineering , 1965 .

[36]  M. El-Hawary,et al.  Optimum scheduling of power systems using functional analysis , 1972 .

[37]  Leo R. Beard,et al.  Objective Determination of Safety Factor in Reservoir Design , 1970 .

[38]  Charles ReVelle,et al.  Linear Decision Rule in Reservoir Management and Design: 2. Performance Optimization , 1970 .

[39]  Antti J. Koivo,et al.  Optimal Scheduling of Hydro-Thermal Power Systems , 1972 .

[40]  R. E. Larson,et al.  Computer-Aided Dispatching and Operations Planning for an Electric Utility with Multiple Types of Generation , 1971 .

[41]  John Eastman,et al.  Linear decision rule in reservoir management and design: 3. Direct capacity determination and intraseasonal constraints , 1973 .

[42]  D. Major Benefit‐Cost Ratios for Projects in Multiple Objective Investment Programs , 1969 .

[43]  M. E. El-Hawary,et al.  Extensions to Functional Optimization of Common-Flow Hydro-Thermal Systems , 1973 .

[44]  Frederick C. Hamlin,et al.  Electrical Features of Smith Mountain Hydro Project, Appalachian Power Company , 1969 .

[45]  A. Arismunandar,et al.  General Time-Dependent Equations for Short-Range Optimization of Hydrothermal Electric Systems , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[46]  V. T. Chow,et al.  Discrete Differential Dynamic Programing Approach to Water Resources Systems Optimization , 1971 .

[47]  Robert Dorfman,et al.  Formal Models in the Design of Water Resource Systems , 1965 .

[48]  I. Hano,et al.  An Application of the Maximum Principle to the Most Economical Operation of Power Systems , 1966 .

[49]  Daniel P. Loucks,et al.  Computer Models for Reservoir Regulation , 1968 .

[50]  Stuart M. Alexander,et al.  Computer Directed Control and Automatic Data Processing for a Hydroelectric Generating System , 1968 .

[51]  Henry D. Jacoby,et al.  Combined use of optimization and simulation models in river basin planning , 1972 .

[52]  Antti J. Koivo,et al.  Effects of Hydro-Dynamics on Optimum Scheduling of Thermo-Hydro Power Systems , 1972 .

[53]  R. H. Hicks,et al.  Large Scale, Nonlinear Optimization of Energy Capability for the Pacific Northwest Hydroelectric System , 1974 .

[54]  Miguel J. Cobian Optimal Pumped Storage Operation with Interconnected Power Systems , 1971 .

[55]  Ricardo Alemany,et al.  Algorithm for solving a class of linear programing problems related to reservoir management and design , 1973 .

[56]  G. W. Stagg,et al.  A Method for Economic Scheduling of a Combined Pumped Hydro and Steam Generating System , 1964 .

[57]  Jakob Rosing,et al.  Composite Representation of a Multireservoir Hydroelectric Power System , 1970 .

[58]  H. H. Happ,et al.  Large Scale Hydro-Thermal Unit Commitment-Method and Results , 1971 .

[59]  D. Jacobson Second-order and Second-variation Methods for Determining Optimal Control: A Comparative Study using Differential Dynamic Programming† , 1968 .

[60]  P. L. Dandeno Hydrothermal Economic Scheduling - Computational Experience with Co-Ordination Equations , 1960, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[61]  P. Rogers A Game Theory Approach to the Problems of International River Basins , 1969 .

[62]  R.E. Larson,et al.  Applications of dynamic programming to the control of water resource systems , 1969, Autom..

[63]  R. Butsch Reservoir System Design Optimization , 1970 .

[64]  I.G.M. Mantera,et al.  Optimum hydroelectric-power-generation scheduling by analogue computer , 1971 .

[65]  G. G. Fintak The Propeller Turbines of the St. Lawrence Power Project , 1960 .

[66]  H. Andre Operating experience with bulb units at the rance tidal power plant and other French hydro-power sites , 1976, IEEE Transactions on Power Apparatus and Systems.

[67]  Warren A. Hall,et al.  An Alternate Procedure for the Optimization of Operations for Planning with Multiple River, Multiple Purpose Systems , 1969 .

[68]  Ieee Report Power Plant Response , 1967 .

[69]  H. Wood,et al.  Soptimum Operation of a Hydrothermal System , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[70]  D. P. Louoks,et al.  a Comparison of Some Dynamic, Linear and Policy Iteration Methods for Reservoir Operation , 1970 .

[71]  Leonard Ortolano,et al.  A dynamic programing‐simulation strategy for the capacity expansion of hydroelectric power systems , 1973 .

[72]  Ignacy Swiecicki Regulation of a Hydraulic Turbine Calculated by Step-By-Step Method , 1961 .

[73]  U. Shamir Optimal Design and Operation of Water Distribution Systems , 1974 .

[74]  C. W. Watchorn,et al.  Inside Hydrothermal Coordination , 1967 .

[75]  William S. Butcher,et al.  STOCHASTIC DYNAMIC PROGRAMMING FOR OPTIMUM RESERVOIR OPERATION1 , 1971 .

[76]  L. T. Fan,et al.  a Nonlinear Model of a Water Reservoir System with Multiple Uses and its Optimization by Combined Use of Dynamic Programming and Pattern Search Techniques , 1969 .

[77]  E. S. Bainbridge,et al.  Hydrothermal Dispatch with Pumped Storage , 1966 .

[78]  O. T. Sigvaldson A simulation model for operating a multipurpose multireservoir system , 1976 .

[79]  Optimal active-reactive dispatch in power systems: Realistic hydro-model , 1977 .

[80]  Warren A. Hall,et al.  Use of Monte Carlo Techniques in the Design and Operation of a Multipurpose Reservoir System , 1971 .

[81]  Fereidoun Mobasheri,et al.  A two‐stage optimization model for design of a multipurpose reservoir , 1970 .

[82]  C. E. Hildebrand The Analysis of Hydroelectric-Power Peaking and Poundage by Computer , 1960, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[83]  L. M. Hovey,et al.  Speed-Regulation Tests on a Hydro Station Supplying an Isolated Load , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[84]  A. Arismunandar,et al.  Bibliography on Optimum Operation of Power Systems: 1919-1959 , 1962 .

[85]  Charles E. Abraham Hydro-Power System Simulation Technique , 1973 .

[86]  Donald Erlenkotter,et al.  Sequencing of interdependent hydroelectric projects , 1973 .

[87]  L. Eisel Chance constrained reservoir model , 1972 .

[88]  B. Bernholtz,et al.  Hydrothermal Economic Scheduling Part II. Extension of the Basic Theory , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[89]  P. A. Mawer,et al.  Improved dynamic programing procedures and their practical application to water resource systems , 1974 .

[90]  S. Vemuri,et al.  Sensitivity analysis of optimum operation of hydro-thermal plants , 1977, IEEE Transactions on Power Apparatus and Systems.

[91]  T. E. Thorgerson,et al.  Electrical features of the Niagara power project , 1961, Electrical Engineering.

[92]  Charles ReVelle,et al.  Linear programming applied to water quality management , 1968 .

[93]  Robert W. Reid,et al.  On the noninferior index approach to large-scale multi-criteria systems , 1971 .

[94]  Warren A. Hall Aqueduct Capacity Under an Optimum Benefit Policy , 1961 .

[95]  H. L. Happ,et al.  OPTIMAL POWER DISPATCH -A COMPREHENSIVE SURVEY , 1977 .

[96]  C. R. Gagnon,et al.  Optimal Hydro Scheduling at the Bonneville Power Administration , 1978, IEEE Transactions on Power Apparatus and Systems.

[97]  Warren A. Hall,et al.  Use of the Critical Period in Reservoir Analysis , 1969 .

[98]  Ieee Report,et al.  Present Practices in the Economic Operation of Power Systems , 1971 .

[99]  D. Dawdy,et al.  Value of Streamflow Data for Project Design—A Pilot Study , 1970 .

[100]  Myron B. Fiering Forecasts with Varying Reliability , 1969 .

[101]  W. Trott,et al.  Optimization of Multiple Reservoir System , 1973 .

[102]  E. B. Dahlin,et al.  Optimal Solution to the Hydro-Steam Dispatch Problem for Certain Practical Systems , 1966 .

[103]  Thomas L. Morin,et al.  Some Efficient Dynamic Programing Algorithms for the Optimal Sequencing and Scheduling of Water Supply Projects , 1971 .

[104]  W.T. Alley Hydroelectric plant capability curves , 1977, IEEE Transactions on Power Apparatus and Systems.

[105]  Charles ReVelle,et al.  Operating Rules for Joint Operation of Raw Water Sources , 1971 .

[106]  Hirohide Hinomoto,et al.  Dynamic programing of capacity expansion of municipal water treatment system , 1972 .

[107]  Yacov Y. Haimes,et al.  Dynamic Programing for the Optimal Sequencing of Water Supply Projects , 1969 .

[108]  R. Oldenburger,et al.  Dynamic Response of a Hydroelectric Plant , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[109]  D. E. Evenson,et al.  TIME SEQUENCING OF ELEMENT CONSTRUCTION IN A MULTI-RESERVOIR SYSTEM , 1970 .

[110]  Thomas E. Croley,et al.  Sequential Stochastic Optimization for Reservoir System , 1974 .

[111]  Designing Reservoirs with Short Streamflow Records , 1971 .

[112]  B. G. Sokkappa Optimum Scheduling of Hydrothermal Systems - A Generalized Approach , 1963 .

[113]  C. Revelle,et al.  The Linear Decision Rule in Reservoir Management and Design: 1, Development of the Stochastic Model , 1969 .

[114]  R. Ringlee Sensitivity methods for economic dispatch of hydroelectric plants , 1965 .

[115]  A. Askew Optimum Reservoir Operating Policies and the Imposition of a Reliability Constraint , 1974 .