Bibliography on Optimal Reservoir Drawdown for the Hydroelectric-Thermal Power System Operation
暂无分享,去创建一个
[1] Y. Larsson,et al. Incremental Cost of Water Power , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[2] Thomas Kennedy,et al. Dispatch of Pumped Hydro Storage on an Interconnected Hydrothermal System , 1965 .
[3] L. Bodin,et al. Multireservoir Operation Studies , 1970 .
[4] W. Yeh,et al. Optimal Timing, Sequencing, and Sizing of Multiple Reservoir Surface Water Supply Facilities , 1974 .
[5] Myron B. Fiering,et al. Queuing Theory and Simulation In Reservoir Design , 1961 .
[6] Y. Ho. Differential games, dynamic optimization, and generalized control theory , 1970 .
[7] Robert J. Ringlee,et al. Susquehanna River Short-Range Hydrothermal Co-ordination , 1963 .
[8] Z. Schweig,et al. Optimal Control of Linked Reservoirs , 1968 .
[9] Robert A. Young,et al. Digital computer simulation for solving management problems of conjunctive groundwater and surface water systems , 1972 .
[10] William S. Butcher,et al. Optimization of the Operation of a Multiple‐Purpose Reservoir by Dynamic Programming , 1968 .
[11] Venkateswararao Vemuri,et al. Multiple-Objective Optimization in Water Resource Systems , 1974 .
[12] S. Arora,et al. A Note on Linear Decision Rules , 1970 .
[13] Nicolaos V. Arvanitidis,et al. Optimal Operation of Multireservoir Systems Using a Composite Representation , 1970 .
[14] R. M. Durstine. Economic Scheduling of Electric Power Production , 1962 .
[15] C. C. Bonin. Water-Hammer Damage to Oigawa Power Station , 1960 .
[16] S. Arora,et al. Optimal Capacities for a Multireservoir System Using the Linear Decision Rule , 1971 .
[17] L. K. Kirchmayer,et al. Optimal control of thermal-hydro system operation , 1963 .
[18] Fereidoun Mobasheri,et al. a Stochastic Dynamic Programming Model for the Optimum Operation of a Multi-Purpose Reservoir , 1973 .
[19] Warren H. Hausman,et al. Sequential Decision Problems: A Model to Exploit Existing Forecasters , 1969 .
[20] Uri Shamir,et al. Water Distribution Systems Analysis , 1968 .
[21] N. Buras,et al. The dynamic programming approach to water‐resources development , 1961 .
[22] Harold Allen Thomas,et al. On the Efficient Use of High Aswan Dam for Hydropower and Irrigation , 1966 .
[23] K. S. Prakasa Rao,et al. Optimal scheduling of pumped storage plants by the method of local variations , 1974 .
[24] M. Ramamoorty,et al. Load scheduling of hydroelectric/thermal generating systems using nonlinear programming techniques , 1970 .
[26] B. Bernholtz,et al. Hydrothermal Economic Scheduling Part IV. A Continuous Procedure for Maximizing the Weighted Output of a Hydroelectric Generating Station , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[27] D. Jacobson. New second-order and first-order algorithms for determining optimal control: A differential dynamic programming approach , 1968 .
[28] Robert E. Larson,et al. Dynamic programming applications to water resource system operation and planning , 1968 .
[29] A. Charnes,et al. Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints , 1963 .
[30] T. N. Saha,et al. An Application of a Direct Method to the Optimal Scheduling of Hydrothermal System , 1978, IEEE Transactions on Power Apparatus and Systems.
[31] Roy Billinton,et al. Optimal Real and Reactive Power Operation in a Hydrothermal System , 1972 .
[32] R. Donachie. Digital Program for Water Network Analysis , 1974 .
[33] H. B. Hamilton,et al. Optimal Long Range hydro Scheduling in the Integrated Power System , 1978, IEEE Transactions on Power Apparatus and Systems.
[34] H.H. Happ,et al. Optimal power dispatchߞA comprehensive survey , 1977, IEEE Transactions on Power Apparatus and Systems.
[35] N. Buras. A Three-Dimensional Optimization Problem in Water-Resources Engineering , 1965 .
[36] M. El-Hawary,et al. Optimum scheduling of power systems using functional analysis , 1972 .
[37] Leo R. Beard,et al. Objective Determination of Safety Factor in Reservoir Design , 1970 .
[38] Charles ReVelle,et al. Linear Decision Rule in Reservoir Management and Design: 2. Performance Optimization , 1970 .
[39] Antti J. Koivo,et al. Optimal Scheduling of Hydro-Thermal Power Systems , 1972 .
[40] R. E. Larson,et al. Computer-Aided Dispatching and Operations Planning for an Electric Utility with Multiple Types of Generation , 1971 .
[41] John Eastman,et al. Linear decision rule in reservoir management and design: 3. Direct capacity determination and intraseasonal constraints , 1973 .
[42] D. Major. Benefit‐Cost Ratios for Projects in Multiple Objective Investment Programs , 1969 .
[43] M. E. El-Hawary,et al. Extensions to Functional Optimization of Common-Flow Hydro-Thermal Systems , 1973 .
[44] Frederick C. Hamlin,et al. Electrical Features of Smith Mountain Hydro Project, Appalachian Power Company , 1969 .
[45] A. Arismunandar,et al. General Time-Dependent Equations for Short-Range Optimization of Hydrothermal Electric Systems , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[46] V. T. Chow,et al. Discrete Differential Dynamic Programing Approach to Water Resources Systems Optimization , 1971 .
[47] Robert Dorfman,et al. Formal Models in the Design of Water Resource Systems , 1965 .
[48] I. Hano,et al. An Application of the Maximum Principle to the Most Economical Operation of Power Systems , 1966 .
[49] Daniel P. Loucks,et al. Computer Models for Reservoir Regulation , 1968 .
[50] Stuart M. Alexander,et al. Computer Directed Control and Automatic Data Processing for a Hydroelectric Generating System , 1968 .
[51] Henry D. Jacoby,et al. Combined use of optimization and simulation models in river basin planning , 1972 .
[52] Antti J. Koivo,et al. Effects of Hydro-Dynamics on Optimum Scheduling of Thermo-Hydro Power Systems , 1972 .
[53] R. H. Hicks,et al. Large Scale, Nonlinear Optimization of Energy Capability for the Pacific Northwest Hydroelectric System , 1974 .
[54] Miguel J. Cobian. Optimal Pumped Storage Operation with Interconnected Power Systems , 1971 .
[55] Ricardo Alemany,et al. Algorithm for solving a class of linear programing problems related to reservoir management and design , 1973 .
[56] G. W. Stagg,et al. A Method for Economic Scheduling of a Combined Pumped Hydro and Steam Generating System , 1964 .
[57] Jakob Rosing,et al. Composite Representation of a Multireservoir Hydroelectric Power System , 1970 .
[58] H. H. Happ,et al. Large Scale Hydro-Thermal Unit Commitment-Method and Results , 1971 .
[59] D. Jacobson. Second-order and Second-variation Methods for Determining Optimal Control: A Comparative Study using Differential Dynamic Programming† , 1968 .
[60] P. L. Dandeno. Hydrothermal Economic Scheduling - Computational Experience with Co-Ordination Equations , 1960, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[61] P. Rogers. A Game Theory Approach to the Problems of International River Basins , 1969 .
[62] R.E. Larson,et al. Applications of dynamic programming to the control of water resource systems , 1969, Autom..
[63] R. Butsch. Reservoir System Design Optimization , 1970 .
[64] I.G.M. Mantera,et al. Optimum hydroelectric-power-generation scheduling by analogue computer , 1971 .
[65] G. G. Fintak. The Propeller Turbines of the St. Lawrence Power Project , 1960 .
[66] H. Andre. Operating experience with bulb units at the rance tidal power plant and other French hydro-power sites , 1976, IEEE Transactions on Power Apparatus and Systems.
[67] Warren A. Hall,et al. An Alternate Procedure for the Optimization of Operations for Planning with Multiple River, Multiple Purpose Systems , 1969 .
[68] Ieee Report. Power Plant Response , 1967 .
[69] H. Wood,et al. Soptimum Operation of a Hydrothermal System , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[70] D. P. Louoks,et al. a Comparison of Some Dynamic, Linear and Policy Iteration Methods for Reservoir Operation , 1970 .
[71] Leonard Ortolano,et al. A dynamic programing‐simulation strategy for the capacity expansion of hydroelectric power systems , 1973 .
[72] Ignacy Swiecicki. Regulation of a Hydraulic Turbine Calculated by Step-By-Step Method , 1961 .
[73] U. Shamir. Optimal Design and Operation of Water Distribution Systems , 1974 .
[74] C. W. Watchorn,et al. Inside Hydrothermal Coordination , 1967 .
[75] William S. Butcher,et al. STOCHASTIC DYNAMIC PROGRAMMING FOR OPTIMUM RESERVOIR OPERATION1 , 1971 .
[76] L. T. Fan,et al. a Nonlinear Model of a Water Reservoir System with Multiple Uses and its Optimization by Combined Use of Dynamic Programming and Pattern Search Techniques , 1969 .
[77] E. S. Bainbridge,et al. Hydrothermal Dispatch with Pumped Storage , 1966 .
[78] O. T. Sigvaldson. A simulation model for operating a multipurpose multireservoir system , 1976 .
[79] Optimal active-reactive dispatch in power systems: Realistic hydro-model , 1977 .
[80] Warren A. Hall,et al. Use of Monte Carlo Techniques in the Design and Operation of a Multipurpose Reservoir System , 1971 .
[81] Fereidoun Mobasheri,et al. A two‐stage optimization model for design of a multipurpose reservoir , 1970 .
[82] C. E. Hildebrand. The Analysis of Hydroelectric-Power Peaking and Poundage by Computer , 1960, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[83] L. M. Hovey,et al. Speed-Regulation Tests on a Hydro Station Supplying an Isolated Load , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[84] A. Arismunandar,et al. Bibliography on Optimum Operation of Power Systems: 1919-1959 , 1962 .
[85] Charles E. Abraham. Hydro-Power System Simulation Technique , 1973 .
[86] Donald Erlenkotter,et al. Sequencing of interdependent hydroelectric projects , 1973 .
[87] L. Eisel. Chance constrained reservoir model , 1972 .
[88] B. Bernholtz,et al. Hydrothermal Economic Scheduling Part II. Extension of the Basic Theory , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[89] P. A. Mawer,et al. Improved dynamic programing procedures and their practical application to water resource systems , 1974 .
[90] S. Vemuri,et al. Sensitivity analysis of optimum operation of hydro-thermal plants , 1977, IEEE Transactions on Power Apparatus and Systems.
[91] T. E. Thorgerson,et al. Electrical features of the Niagara power project , 1961, Electrical Engineering.
[92] Charles ReVelle,et al. Linear programming applied to water quality management , 1968 .
[93] Robert W. Reid,et al. On the noninferior index approach to large-scale multi-criteria systems , 1971 .
[94] Warren A. Hall. Aqueduct Capacity Under an Optimum Benefit Policy , 1961 .
[95] H. L. Happ,et al. OPTIMAL POWER DISPATCH -A COMPREHENSIVE SURVEY , 1977 .
[96] C. R. Gagnon,et al. Optimal Hydro Scheduling at the Bonneville Power Administration , 1978, IEEE Transactions on Power Apparatus and Systems.
[97] Warren A. Hall,et al. Use of the Critical Period in Reservoir Analysis , 1969 .
[98] Ieee Report,et al. Present Practices in the Economic Operation of Power Systems , 1971 .
[99] D. Dawdy,et al. Value of Streamflow Data for Project Design—A Pilot Study , 1970 .
[100] Myron B. Fiering. Forecasts with Varying Reliability , 1969 .
[101] W. Trott,et al. Optimization of Multiple Reservoir System , 1973 .
[102] E. B. Dahlin,et al. Optimal Solution to the Hydro-Steam Dispatch Problem for Certain Practical Systems , 1966 .
[103] Thomas L. Morin,et al. Some Efficient Dynamic Programing Algorithms for the Optimal Sequencing and Scheduling of Water Supply Projects , 1971 .
[104] W.T. Alley. Hydroelectric plant capability curves , 1977, IEEE Transactions on Power Apparatus and Systems.
[105] Charles ReVelle,et al. Operating Rules for Joint Operation of Raw Water Sources , 1971 .
[106] Hirohide Hinomoto,et al. Dynamic programing of capacity expansion of municipal water treatment system , 1972 .
[107] Yacov Y. Haimes,et al. Dynamic Programing for the Optimal Sequencing of Water Supply Projects , 1969 .
[108] R. Oldenburger,et al. Dynamic Response of a Hydroelectric Plant , 1962, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[109] D. E. Evenson,et al. TIME SEQUENCING OF ELEMENT CONSTRUCTION IN A MULTI-RESERVOIR SYSTEM , 1970 .
[110] Thomas E. Croley,et al. Sequential Stochastic Optimization for Reservoir System , 1974 .
[111] Designing Reservoirs with Short Streamflow Records , 1971 .
[112] B. G. Sokkappa. Optimum Scheduling of Hydrothermal Systems - A Generalized Approach , 1963 .
[113] C. Revelle,et al. The Linear Decision Rule in Reservoir Management and Design: 1, Development of the Stochastic Model , 1969 .
[114] R. Ringlee. Sensitivity methods for economic dispatch of hydroelectric plants , 1965 .
[115] A. Askew. Optimum Reservoir Operating Policies and the Imposition of a Reliability Constraint , 1974 .