A Visual Approach to Construction Cost Estimating

A VISUAL APPROACH TO CONSTRUCTION COST ESTIMATING Phuwadol Samphaongoen, B.S. Marquette University, 2010 Construction cost estimating is considered one of the most important and critical phases of a construction project. Preparing reliable and accurate estimates to help decision makers is the most challenging assignment that estimators face. An estimate is not only necessary for proposal preparation but also for several project management functions. Despite the importance of estimating, it has remained a very time consuming process. The most inefficient part of construction cost estimating is determination of the amount of resources needed for the construction of a project. This is also known as quantity takeoff. Quantity takeoff is a very long and error-prone process that is performed manually by estimators. Missing or duplicating work items are among the errors that can occur during the quantity takeoff process. New Parametric CAD software has recently attained widespread attention in the Architectural, Engineering, and Construction (AEC) industry. It represents the development and use of computer-generated models to simulate the planning, design, construction and operation of a facility. It helps architects, engineers, and contractors visualize what is to be built in a simulated environment and to identify potential design, construction or operational problems. The model created from parametric CAD software will significantly increase construction cost estimator productivity by substantially reducing the manual work necessary for performing quantity takeoffs. This study presents a methodology that uses parametric CAD software and visualization technologies to streamline the estimating process. Although this methodology won’t totally automate the estimating process, it will help in the following areas: (1) providing a navigable 3D model of the project, (2) simplifying the quantity takeoff process, and (3) eliminating manual calculations and search for data. This study uses visualization technologies to navigate through a 3D CAD model. This would provide the estimator with a tool to improve the understanding of the location and relationships between elements in a model. The quantity takeoff process may be simplified by using properties and geometry information extracted from the 3D CAD model. This study also uses a database technology to store labor, equipment, and material cost data. This helps eliminate manual calculations and enables an estimator to search for data stored in the database. A case study is presented to illustrate the process and capabilities of the developed system.

[1]  N. Hammond,et al.  The role of cognitive psychology in user-interface design , 1987 .

[2]  William J. Schroeder,et al.  The Visualization Toolkit , 2005, The Visualization Handbook.

[3]  Robin Dewson Beginning SQL Server 2008 for Developers: From Novice to Professional , 2008 .

[4]  Daniel Thalmann,et al.  Stepping into virtual reality , 2008 .

[5]  Hongxia Wang,et al.  Integration of building and urban nD data to support intelligent cities , 2006 .

[6]  John Vince,et al.  Introduction to Virtual Reality , 2004, Springer London.

[7]  Rick Best,et al.  Design and Construction: Building in Value , 2002 .

[8]  Brad Hardin,et al.  BIM and Construction Management: Proven Tools, Methods, and Workflows , 2009 .

[9]  John E. Schaufelberger,et al.  Construction Cost Estimating: Process and Practices , 2004 .

[10]  David J. Pratt Fundamentals of Construction Estimating , 1995 .

[11]  Peter Shirley,et al.  Fundamentals of computer graphics , 2018 .

[12]  William J. Schroeder,et al.  Overview of Visualization , 2005, The Visualization Handbook.

[13]  Naomi Garnett,et al.  Project modelling in construction: --seeing is believing , 1997 .

[14]  Ying-Kit Choi Principles of applied civil engineering design , 2004 .

[15]  Robin Dewson,et al.  Beginning C# Databases: From Novice to Professional , 2004 .

[16]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[17]  Martin Riese One Island East, Hong Kong: A Case Study in Construction Virtual Prototyping , 2009 .

[18]  Dov Te'eni,et al.  Human-Computer Interaction: Developing Effective Organizational Information Systems , 2006 .

[19]  Saeed Karshenas,et al.  A Case-Based Reasoning Approach to Construction Cost Estimating , 2002 .

[20]  Dana K. Smith,et al.  Building Information Modeling: A Strategic Implementation Guide for Architects, Engineers, Constructors, and Real Estate Asset Managers , 2009 .

[21]  Sabah Alkass,et al.  Computer-Integrated System for Estimating the Costs of Building Projects , 2007 .

[22]  Joe M Powell The new competitiveness in design and construction , 2008 .

[23]  Steve Rowlinson,et al.  Design-for-Safety-Process (DFSP) Utilizing Virtual Reality as a Representation Tool , 2000 .

[24]  Kathleen Richardson DESIGN BUILD PROJECT DELIVERY IN THE AIR FORCE , 2009 .

[25]  Martin Beck,et al.  Evolutionary Computation and Visualisation as Decision Support tools For Conceptual Building Design , 2005 .

[26]  William R. Sherman,et al.  Understanding Virtual Reality , 2003 .

[27]  Thomas Mills,et al.  Teaching Paperless Detailed Quantity Take-off and Estimating , 2002 .

[28]  Alistair G.F. Gibb,et al.  VR or PR: Virtual or Physical Reality? , 2009 .

[29]  Jan Karlshøj Data visualization: A Danish example , 2007 .

[30]  Robert van Liere,et al.  Trends in Interactive Visualization: State-of-the-Art Survey , 2008 .

[31]  Stephen C. Dewhurst,et al.  Programming in C++ , 1989, OOPS Messenger.

[32]  Saeed Karshenas,et al.  VISUALIZATION AND MULTIMEDIA APPLICATIONS IN COST ESTIMATING EDUCATION , 2009 .

[33]  Steve Bryson Direct Manipulation in Virtual Reality , 2005, The Visualization Handbook.

[34]  Martin Fischer,et al.  Reshaping the Life Cycle Process with Virtual Design and Construction Methods , 2009 .

[35]  명현,et al.  Information Technologies for Construction Managers, Architects and Engineers , 2010 .

[36]  Richard J. Boland,et al.  Virtual Prototyping of Financial Flows as a Form of Management Control , 2009 .

[37]  Eddy Krygiel,et al.  Mastering Revit Architecture 2008 , 2007 .

[38]  A. Retik Visualization For Decision Making InConstruction Planning , 1970 .

[39]  Saeed Karshenas Cost Estimating in the Age of 3-D CAD Software and Object Databases , 2005 .

[40]  Jim X. Chen,et al.  Visualization Using Virtual Reality , 2005, The Visualization Handbook.

[41]  Salman Azhar,et al.  Building Information Modeling ( BIM ) : Benefits , Risks and Challenges , 2008 .

[42]  Sikha Bagui,et al.  Database design using entity-relationship diagrams , 2003 .

[43]  Kenneth R. O'Connell Visual Ways of Knowing, Thinking, and Interacting , 1992, Interactive Learning Through Visualization.

[44]  Hau Yan Leung,et al.  Building Information Modelling (BIM): A new paradigm for visual interactive modeling and simulation for construction project , 2008 .

[45]  John Carter,et al.  Relational Database , 1994, Encyclopedia of Database Systems.

[46]  Ming Sun,et al.  Understanding IT in Construction , 2003 .

[47]  James M. Neil Construction Cost Estimating for Project Control , 1981 .

[48]  Gregory Howell,et al.  The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.

[49]  Calin Popescu,et al.  Estimating Building Costs , 2003 .

[50]  Jon D. Reid,et al.  Beginning VB 2005 Databases: From Novice to Professional , 2006 .

[51]  Stuart Ferguson,et al.  A hitchhiker's guide to virtual reality , 2007 .