Wharf Structural Design for No.30 Berth of Jingtang Harbour District,Tangshan Port

The wharf structures at the both end of No.30 Berth have been built,considering the diffe-rent structure of them,the design for No.30 Berth wharf structures and foundation structure of hoisting equipment were made and the structural reforming design for the connecting section built in No.31 Berth are also performed.The different structures adopted for the same berth and the berth dredging depth remolding for the old terminal all are the brave test that has provided the successful experience for the similar engineering construction.