Applications of fuzzy ranking methods to risk-management decisions

The Department of Energy is making significant improvements to its nuclear facilities as a result of more stringent regulation, internal audits, and recommendations from external review groups. A large backlog of upgrades has resulted. Currently, a prioritization method is being utilized which relies on a matrix of potential consequence and probability of occurrence. The attributes of the potential consequences considered include likelihood, exposure, public health and safety, environmental impact, site personnel safety, public relations, legal liability, and business loss. This paper describes an improved method which utilizes fuzzy multiple attribute decision methods to rank proposed improvement projects.© (1993) COPYRIGHT SPIE--The International Society for Optical Engineering. Downloading of the abstract is permitted for personal use only.