Development of a conceptual team integration performance index for alliance projects
暂无分享,去创建一个
[1] Yi Min Xie,et al. Overview of alliancing research and practice in the construction industry , 2012 .
[2] Chimay J. Anumba,et al. An integrated framework for concurrent life-cycle design and construction , 1998 .
[3] Dennis M. Buede,et al. The Engineering Design of Systems , 2009 .
[4] A. Dainty,et al. Integrated project teams’ performance in managing unexpected change events , 1999 .
[5] Pertti Lahdenperä,et al. Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery , 2012 .
[6] Maliha S. Nash,et al. Handbook of Parametric and Nonparametric Statistical Procedures , 2001, Technometrics.
[7] Suzanne Wilkinson,et al. Key practice indicators of team integration in construction projects: a review , 2013 .
[8] Ioannis E. Tsolas,et al. Sustainable construction and drivers of change in Greece: a Delphi study , 2006 .
[9] Suzanne D. Pawlowski,et al. The Delphi method as a research tool: an example, design considerations and applications , 2004, Inf. Manag..
[10] Steve Rowlinson,et al. Project alliances in the Australian construction industry: a case study of a water treatment project , 2006 .
[11] Albert P.C. Chan,et al. Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study , 2009 .
[12] Albert P.C. Chan,et al. Measuring complexity for building projects: a Delphi study , 2012 .
[13] John A. Gambatese,et al. Qualitative Research: Application of the Delphi Method to CEM Research , 2010 .
[14] Mike Bresnen,et al. Deconstructing partnering in project-based organisation: Seven pillars, seven paradoxes and seven deadly sins , 2007 .
[15] Stephen Emmitt,et al. Investigating the integration of design and construction from a “lean” perspective , 2009 .
[16] Patrick T.I. Lam,et al. Application of Delphi method in selection of procurement systems for construction projects , 2001 .
[17] John A. Gambatese,et al. Construction Safety Risk Mitigation , 2009 .
[18] Fjm Frits Scheublin. Project alliance contract in The Netherlands , 2001 .
[19] Greg Rooney. Project Alliancing – The Process Architecture of a Relationship Based Project Delivery System for Complex Infrastructure Projects , 2009 .
[20] Roy C. Schmidt,et al. MANAGING DELPHI SURVEYS USING NONPARAMETRIC STATISTICAL TECHNIQUES , 1997 .
[21] Mohan M. Kumaraswamy,et al. Constructing Relationally Integrated Teams , 2005 .
[22] David R. Riley,et al. Delivering Sustainable, High-Performance Buildings: Influence of Project Delivery Methods on Integration and Project Outcomes , 2013 .
[23] Derek H.T. Walker,et al. Enthusiasm, commitment and project alliancing: an Australian experience , 2002 .
[24] Liang Y Liu,et al. Relationship between Project Interaction and Performance Indicators , 1996 .
[25] G. Lindahl,et al. Swedish construction clients' views on project success and measuring performance , 2008 .
[26] N. Noorderhaven,et al. Building trust in construction partnering projects: An exploratory case-study , 2011 .
[27] Matthew W. Sakal. Project Alliancing: A Relational Contracting Mechanism for Dynamic Projects , 2005 .
[28] Lawrence D. Pohlmann,et al. The Engineering Design of Systems – Models and Methods , 2000 .
[29] Peter E.D. Love,et al. A model for supporting inter-organizational relations in the supply chain , 2002 .
[30] Sai On Cheung,et al. An automated partnering monitoring system—Partnering Temperature Index , 2003 .
[31] Mohan M. Kumaraswamy,et al. Selecting sustainable teams for PPP projects , 2008 .
[32] Keith D. Hampson,et al. Project alliancing vs project partnering: a case study of the Australian National Museum Project , 2002 .
[33] Keith D. Hampson,et al. Project alliancing at National Museum of Australia : the collaborative process , 2004 .
[34] Albert P.C. Chan,et al. Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study , 2007 .
[35] P. Love,et al. Price Competitive Alliance Projects: Identification of Success Factors for Public Clients , 2010 .
[36] Andrew R.J. Dainty,et al. The extent of team integration within construction projects , 2006 .
[37] Albert P.C. Chan,et al. The definition of alliancing in construction as a Wittgenstein family-resemblance concept , 2007 .
[38] James S. Dyer,et al. Attribute weighting methods and decision quality in the presence of response error: A simulation study , 1998 .
[39] Albert P.C. Chan,et al. Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong , 2008 .
[40] P. Lahdenperä. Towards the use of project alliance: Joint development of a team selection procedure as an example of steps taken , 2011 .
[41] Bruce E. Barrett,et al. Decision quality using ranked attribute weights , 1996 .
[42] Albert P.C. Chan. Time–cost relationship of public sector projects in Malaysia , 2001 .
[43] Peter E.D. Love,et al. Concurrent engineering : a strategy for procuring construction projects , 1998 .
[44] Dennis M. Buede,et al. The Engineering Design of Systems: Models and Methods , 1999 .
[45] Xianhai Meng,et al. The effect of relationship management on project performance in construction , 2012 .
[46] Svetlana. Cicmil,et al. Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms , 2005 .
[47] Hedley Smyth,et al. A Critical Review of Performance Measurement in Construction , 2012 .
[48] Chang-Taek Hyun,et al. Effect of Delivery Methods on Design Performance in Multifamily Housing Projects , 2008 .
[49] David Arditi,et al. Factors Affecting International Construction , 2005 .
[50] Andrew R.J. Dainty,et al. Redefining performance measures for construction project managers: an empirical evaluation , 2003 .