Six Sigma performance for non-normal processes

Six Sigma is a widely used method to improve processes from various industry sectors. The target failure rate for Six Sigma projects is 3.4 parts per million or 2 parts per billion. In this paper, we show that when a process is exponential, attaining such performances may require a larger reduction in variation (i.e., greater quality-improvement effort). In addition, identifying whether the process data are of non-normal distribution is important to more accurately estimate the effort required to improve the process. A key finding of this study is that, for a low kσ level, the amount of variation reduction required to improve an exponentially distributed process is less than that of a normally distributed process. On the other hand, for a higher kσ level, the reverse scenario is the case. This study also analyzes processes following Gamma and Weibull distributions, and the results further support our concern that simply reporting the Sigma level as an indication of the quality of a product or process can be misleading. Two optimization models are developed to illustrate the effect of underestimating the quality-improvement effort on the optimal solution to minimize cost. In conclusion, the classical and widely used assumption of a normally distributed process may lead to implementation of quality-improvement strategies or the selection of Six Sigma projects that are based on erroneous solutions.

[1]  Maneesh Kumar,et al.  Six sigma in service organisations: Benefits, challenges and difficulties, common myths, empirical observations and success factors , 2007 .

[2]  Nicholas R. Farnum,et al.  USING JOHNSON CURVES TO DESCRIBE NON-NORMAL ROCESS DATA , 1996 .

[3]  Mohamed Gamal Aboelmaged,et al.  Six Sigma quality: a structured review and implications for future research , 2010 .

[4]  Ayon Chakraborty,et al.  Case study analysis of Six Sigma implementation in service organisations , 2012, Bus. Process. Manag. J..

[5]  Babak Abbasi,et al.  A neural network applied to estimate process capability of non-normal processes , 2009, Expert Syst. Appl..

[6]  Robert N. Rodriguez Recent Developments in Process Capability Analysis , 1992 .

[7]  Youn Min Chou,et al.  Transforming Non-Normal Data to Normality in Statistical Process Control , 1998 .

[8]  D. Setijono Normal approximation through data replication when estimating DisPMO, DePMO, left‐side and right‐side Sigma levels from non‐normal data , 2010 .

[9]  Douglas C. Montgomery,et al.  Applied Statistics and Probability for Engineers, Third edition , 1994 .

[10]  Jeh-Nan Pan,et al.  Developing a new key performance index for measuring service quality , 2010, Ind. Manag. Data Syst..

[11]  Ayon Chakraborty,et al.  An empirical analysis on Six Sigma implementation in service organisations , 2013 .

[12]  Kyle B. Stone Four decades of lean: a systematic literature review , 2012 .

[13]  Mahdi Bashiri,et al.  Non-normal multi-response optimization by multivariate process capability index , 2012 .

[14]  Z. Rahman,et al.  An Empirical Investigation of Relationship between Total Quality Management Practices and Quality Performance in Indian Service Companies , 2013 .

[15]  G. D. Taylor,et al.  Process capability analysis—a robustness study , 1993 .

[16]  Davis R. Bothe,et al.  Statistical Reason for the 1.5σ Shift , 2002 .

[17]  Panlop Zeephongsekul,et al.  Process capability estimation for non-normal quality charactersitics using Clement, Burr and Box--Cox methods , 2008 .

[18]  Jeh-Nan Pan,et al.  Process capability analysis for non-normal relay test data , 1997 .

[19]  Douglas C. Montgomery,et al.  PROCESS CAPABILITY INDICES AND NON-NORMAL DISTRIBUTIONS , 1996 .

[20]  Richard Schroeder,et al.  Six Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations , 1999 .

[21]  M. Leyer,et al.  Developing a Six Sigma framework: perspectives from financial service companies , 2013 .

[22]  Ravi S. Behara,et al.  Customer satisfaction measurement and analysis using six sigma , 1995 .

[23]  Mustapha Nourelfath,et al.  Service level robustness in stochastic production planning under random machine breakdowns , 2011, Eur. J. Oper. Res..

[24]  James Tannock,et al.  Business process improvement in services: case studies of financial institutions in Thailand , 2013 .

[25]  W. L. Pearn,et al.  Capability adjustment for gamma processes with mean shift consideration in implementing Six Sigma program , 2008, Eur. J. Oper. Res..