Dynamic behaviour of the track in transitions zones considering the differential settlement

[1]  S L Grassie,et al.  The Dynamic Response of Railway Track With Unsupported Sleepers , 1985 .

[2]  Ernest T. Selig,et al.  Track Geotechnology and Substructure Management , 1995 .

[3]  Jens C. O. Nielsen,et al.  VERTICAL DYNAMIC INTERACTION BETWEEN TRAIN AND TRACK INFLUENCE OF WHEEL AND TRACK IMPERFECTIONS , 1995 .

[4]  A. J. Truscott,et al.  Adaptive Ride Control In Active Suspension Systems , 1995 .

[5]  Sato Yoshihiko,et al.  Japanese Studies on Deterioration of Ballasted Track , 1995 .

[6]  H. Scheffel,et al.  The Vertical Dynamic Response of a Rail Vehicle caused by Track Stiffness Variations along the Track , 1996 .

[7]  Hem Hunt,et al.  Settlement of railway track near bridge abutments , 1997 .

[8]  Simon Iwnicki,et al.  The Manchester Benchmarks for Rail Vehicle Simulation , 1998 .

[9]  Hans True,et al.  VEHICLE-TRACK DYNAMICS ON A RAMP AND ON THE BRIDGE: SIMULATION AND MEASUREMENTS , 1999 .

[10]  Makoto Ishida,et al.  Influence of Loose Sleeper on Track Dynamics and Bending Fatigue of Rail Welds , 1999 .

[11]  Tore Dahlberg,et al.  Some railroad settlement models—A critical review , 2001 .

[12]  Cai Cheng Research on Dynamic Interaction of Train and Track on Roadbed-bridge Transition Section , 2001 .

[13]  K Gylltoft,et al.  Infuence of cracked sleepers on the global track response: Coupling of a linear track model and nonlinear finite element analyses , 2002 .

[14]  Rolf Lammering,et al.  The Dynamics of Railway Track and Subgrade with Respect to Deteriorated Sleeper Support , 2003 .

[15]  G. Gudehus,et al.  Numerical Model and Laboratory Tests on Settlement of Ballast Track , 2003 .

[16]  K. Krishnan Nair,et al.  Dynamic studies of railtrack sleepers in a track structure system , 2003 .

[17]  P. Woodward,et al.  Track Stiffness Management using the XiTRACK GeoComposite , 2004 .

[18]  Xiaoyan Lei,et al.  Dynamic response analyses of vehicle and track coupled system on track transition of conventional high speed railway , 2004 .

[19]  Jianhui Lin,et al.  Modelling and experiment of railway ballast vibrations , 2004 .

[20]  Andreas Lundqvist,et al.  Load impact on railway track due to unsupported sleepers , 2005 .

[21]  Dingqing Li,et al.  Transition of Railroad Bridge Approaches , 2005 .

[22]  Andreas Lundqvist,et al.  Railway track stiffness variation - consequences and countermeasures , 2010 .

[23]  Rikard Larsson,et al.  Influence of railway track stiffness variations on wheel/rail contact force , 2006 .

[24]  Dingqing Li,et al.  Design of Track Transitions , 2006 .

[25]  Takahiro Suzuki,et al.  Evaluation of Countermeasures against Differential Settlement at Track Transitions , 2007 .

[26]  Jean-Louis Briaud,et al.  Preliminary Evaluation of the Bump at the End of the Railway Bridge , 2011 .

[27]  Z. G. Li,et al.  Vehicle/Track Impact Due to Passing the Transition between a Floating Slab and Ballasted Track , 2008 .

[28]  James P Hyslip,et al.  Railway Bridge Transition Case Study , 2009 .

[29]  Numerical simulation of embankment—structure transition design , 2009 .

[30]  Zuzana Dimitrovová,et al.  Critical velocity of a load moving on a beam with a sudden change of foundation stiffness: Applications to high-speed trains , 2009 .

[31]  M X D Li,et al.  A Study of the Effect of Global Track Stiffness and Its Variations on Track Performance: Simulation and Measurement , 2010 .

[32]  Wolfgang Fengler,et al.  Setzungsverhalten des Schotters , 2010 .

[33]  B. Indraratna,et al.  Field Assessment of the Performance of a Ballasted Rail Track with and without Geosynthetics , 2010 .

[34]  X Lei,et al.  Influence of Track Stiffness Distribution on Vehicle and Track Interactions in Track Transition , 2010 .

[35]  William Powrie,et al.  An Assessment of Transition Zone Performance , 2011 .

[36]  Pedro Galvín,et al.  Fully three-dimensional analysis of high-speed train–track–soil-structure dynamic interaction , 2010 .

[37]  Dingqing Li,et al.  Railway Bridge Approaches under Heavy Axle Load Traffic: Problems, Causes, and Remedies , 2010 .

[38]  Manuel A.G. Silva,et al.  A Settlement Model for Ballast at Transition Zones , 2010 .

[39]  B. Coelho Dynamics of railway transition zones in soft soils , 2011 .

[40]  Tore Dahlberg,et al.  Dynamic behaviour of an in situ partially supported concrete railway sleeper , 2011 .

[41]  J. N. Varandas,et al.  Dynamic behaviour of railway tracks on transitions zones , 2011 .

[42]  Justin Kennedy,et al.  Behaviour of train–track interaction in stiffness transitions , 2012 .

[43]  Ricardo Insa,et al.  Analysis of the influence of under sleeper pads on the railway vehicle/track dynamic interaction in transition zones , 2012 .

[44]  Rui Calçada,et al.  Track–ground vibrations induced by railway traffic: In-situ measurements and validation of a 2.5D FEM-BEM model , 2012 .

[45]  Yao Shan,et al.  Influence of different transition zones on the dynamic response of track–subgrade systems , 2013 .

[46]  Andrew Chan,et al.  Measurements and simulation of the dynamic responses of a bridge–embankment transition zone below a heavy haul railway line , 2013 .

[47]  Rui Calçada,et al.  Transition zones to railway bridges: Track measurements and numerical modelling , 2014 .

[48]  Erol Tutumluer,et al.  An integrated approach to dynamic analysis of railroad track transitions behavior , 2014 .

[49]  P. Hölscher,et al.  Settlement of ballasted track under traffic loading: Application to transition zones , 2014 .

[50]  I. Y. Shevtsov,et al.  Improvement of vehicle–turnout interaction by optimising the shape of crossing nose , 2014 .

[51]  P. A. Ferreira,et al.  Numerical modelling of high speed train/track system for the reduction of vibration levels and maintenance needs of railway tracks , 2015 .

[52]  Rui Calçada,et al.  Under sleeper pads in transition zones at railway underpasses: numerical modelling and experimental validation , 2015 .

[53]  Rui Calçada,et al.  Design and construction of backfills for railway track transition zones , 2015 .

[54]  Stephen T. Wilk,et al.  Evaluation of Tie Support at Transition Zones , 2015 .

[55]  Karl Josef Witt,et al.  Numerical study of transition zone between ballasted and ballastless railway track , 2015 .

[56]  Rolf Dollevoet,et al.  Analysis of the Dynamic Behaviour of a Railway Track in Transition Zones With Differential Settlement , 2015 .

[57]  Rui Calçada,et al.  Non-Linear Behaviour of Geomaterials in Railway Tracks under Different Loading Conditions☆ , 2016 .

[58]  Luigi dell’Olio,et al.  Track transitions in railways: A review , 2016 .

[59]  Stephen T. Wilk,et al.  Root cause of differential movement at bridge transition zones , 2016 .

[60]  Rui Calçada,et al.  A numerical study on the influence of backfill settlements in the train/track interaction at transition zones to railway bridges , 2016 .

[61]  Haoyu Wang,et al.  Corrective countermeasure for track transition zones in railways: Adjustable fastener , 2018, Engineering Structures.

[62]  Haoyu Wang,et al.  Methodology for the comprehensive analysis of railway transition zones , 2018, Computers and Geotechnics.

[63]  Haoyu Wang,et al.  Experimental analysis of railway track settlement in transition zones , 2017, Proceedings of the Institution of Mechanical Engineers. Part F, Journal of rail and rapid transit.