Time-Cost Trade-Offs in Overlapped Product Development
暂无分享,去创建一个
[1] Durward K. Sobek,et al. The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .
[2] E. Mansfield. Research and innovation in the modern corporation , 1972 .
[3] Ikujiro Nonaka,et al. Managing the new product development process , 1985 .
[4] S. Hart. New Product Development , 1995 .
[5] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[6] David Robertson,et al. Product development performance: Strategy, organization, and management in the world auto industry , 1992 .
[7] J. Horowitz,et al. Critical Path Problems with Concave Cost-Time Curves , 1972 .
[8] A. Kanda,et al. A network flow procedure for project crashing with penalty nodes , 1984 .
[9] Preston G. Smith,et al. Developing products in half the time , 1995 .
[10] E. B. Berman,et al. Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions , 1964 .
[11] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[12] Robert P. Smith,et al. A predictive model of sequential iteration in engineering design , 1997 .
[13] Stephan Foldes,et al. PERT and crashing revisited: Mathematical generalizations , 1990 .
[14] S. S. Erenguc,et al. The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows , 1996 .
[15] I. Nonaka,et al. Managing the new product development process , 1985 .
[16] Daniel E. Whitney,et al. Designing the design process , 1990 .
[17] M. Rosenau. Faster New Product Development , 1988 .
[18] D. R. Fulkerson. A Network Flow Computation for Project Cost Curves , 1961 .
[19] R. M. Eastman. Engineering information release prior to final design freeze , 1980, IEEE Transactions on Engineering Management.
[20] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[21] Kim B. Clark,et al. Product development performance : strategy, organization, and management in the world auto industry / Kim B. Clark, Tahahiro Fujimoto , 1991 .
[22] Reza H. Ahmadi,et al. Managing Development Risk in Product Design Processes , 1999, Oper. Res..
[23] Evan L. Porteus,et al. Optimal Timing of Reviews in Concurrent Design for Manufacturability , 1995 .