Fuzzy model for predicting project performance based on procurement experiences

Abstract This paper presents a data-clustering-based fuzzy model for predicting the performance of construction projects delivered through different procurement methods. To illustrate the model, a sample of 96 substation projects of an electric power company, delivered through the design–bid–build (DBB), design–build (DB), and turnkey (TK) methods, were used as training and testing data for model development and verification. Through a factor analysis, an initial set of 48 variables was reduced to nine inputs to the model for predicting eight performance metrics as outputs of the model. To establish the input–output relationships for each metric, Sugeno-type fuzzy inference systems were built, wherein the fuzzy rules were derived from selected projects as the estimated cluster centers in the training data. For the limited sample, zeroth-order systems built with hybrid training were found to outperform both first-order systems and stepwise regression models in prediction accuracy, while sensitivity analyses confirmed their robustness. As the data represents the company's procurement experiences of substation projects, the model may be regarded as a way of implementing organizational learning to improve procurement decision.

[1]  Li-Chung Chao Fuzzy Logic Model for Determining Minimum Bid Markup , 2007, Comput. Aided Civ. Infrastructure Eng..

[2]  Miroslaw J. Skibniewski,et al.  Fuzzy Logic for Evaluating Alternative Construction Technology , 1998 .

[3]  Hojjat Adeli,et al.  Neural Networks in Civil Engineering: 1989–2000 , 2001 .

[4]  Sai On Cheung,et al.  Improving objectivity in procurement selection , 2001 .

[5]  Joseph H. M. Tah,et al.  A proposal for construction project risk assessment using fuzzy logic , 2000 .

[6]  Mohamed Marzouk,et al.  Fuzzy Clustering Model for Estimating Haulers’ Travel Time , 2004 .

[7]  Aminah Robinson Fayek,et al.  A decision support system for contractor prequalification for surety bonding , 2012 .

[8]  Danny C. K. Ho,et al.  Design and Build Project Success Factors: Multivariate Analysis , 2001 .

[9]  Albert P.C. Chan,et al.  Framework of Success Criteria for Design/Build Projects , 2002 .

[10]  Stephen L. Chiu,et al.  Fuzzy Model Identification Based on Cluster Estimation , 1994, J. Intell. Fuzzy Syst..

[11]  Peter E.D. Love,et al.  Selecting a suitable procurement method for a building project , 1998 .

[12]  Ola Lædre,et al.  Procurement Routes in Public Building and Construction Projects , 2006 .

[13]  F. Ling,et al.  Problems encountered by owners of design–build projects in Singapore , 2008 .

[14]  Chi Ming Tam,et al.  Design and Build on a complicated redevelopment project in Hong Kong: The Happy Valley Racecourse Redevelopment , 2000 .

[15]  Florence Yean Yng Ling,et al.  Predicting Performance of Design-Build and Design-Bid-Build Projects , 2004 .

[16]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[17]  Jyh-Shing Roger Jang,et al.  ANFIS: adaptive-network-based fuzzy inference system , 1993, IEEE Trans. Syst. Man Cybern..

[18]  Keith R. Molenaar,et al.  MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .