Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization

AbstractModularization is a well-established technique that can improve the construction industry by exporting a portion of site-based work to fabrication shops. However, its application in the industry is limited. The Engineering, Procurement and Construction (EPC) industry needs new approaches to reach higher levels of modularization. The purpose of this study is to determine what changes in current EPC processes are needed to create an optimal environment for a broader and more effective use of modularization. In creating such an nvironment, it is necessary to know the factors that lead to success. The most influential critical success factors (CSFs; 21 total) have been determined by the expertise of a research team who compiled a detailed list by adding CSF enablers. CSF enablers are additional steps that can facilitate accomplishment of the associated CSF. A closer look at the top five CSFs indicates that project teams should pay particular attention to module envelope limitations, team agreement on ...

[1]  Alistair G.F. Gibb,et al.  Re-engineering through pre-assembly: client expectations and drivers , 2003 .

[2]  Na Lu,et al.  The Current Use of Offsite Construction Techniques in the United States Construction Industry , 2009 .

[3]  Iris D. Tommelein,et al.  IMPROVING DESIGN FITNESS THROUGH TOLERANCE ANALYSIS AND TOLERANCE ALLOCATION , 2002 .

[4]  Alistair G.F. Gibb,et al.  Future opportunities for offsite in the UK , 2007 .

[5]  Mohamed Al-Hussein,et al.  Simulation‐based scheduling of module assembly yards: case study , 2007 .

[6]  Alistair G.F. Gibb,et al.  Considerations for assessing the benefits of standardisation and pre-assembly in construction , 2002 .

[7]  Michael W. Golay,et al.  Modular design and construction techniques for nuclear power plants , 1997 .

[8]  Alistair G.F. Gibb,et al.  Client drivers for construction projects: implications for standardization , 2001 .

[9]  Gunnar Erixon,et al.  Controlling Design Variants: Modular Product Platforms , 1999 .

[10]  Mohamed Al-Hussein,et al.  Automated post-simulation visualization of modular building production assembly line , 2012 .

[11]  G. P. Burke,et al.  Modularization speeds construction , 1998 .

[12]  Rafael Sacks,et al.  Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities , 2008 .

[13]  Mohamed Al-Hussein,et al.  VIRTUAL CONSTRUCTION AUTOMATION FOR MODULAR ASSEMBLY OPERATIONS , 2009 .

[14]  Karl T. Ulrich,et al.  A Framework for Including the Value of Time in Design-for-manufacturing Decision Making , 1993 .

[15]  Joseph Neelamkavil Automation in the Prefab and Modular Construction Industry , 2009 .

[16]  Carl T. Haas,et al.  Considering prework on industrial projects , 2005 .

[17]  Andrew R.J. Dainty,et al.  Strategies for integrating the use of off-site production technologies in house building , 2012 .

[18]  Alistair G.F. Gibb,et al.  Benefit evaluation for off‐site production in construction , 2006 .

[19]  David M. Miller,et al.  A knowledge-based approach to design for manufacturability , 1993, J. Intell. Manuf..

[20]  Mohamed Al-Hussein,et al.  Simulation of modular building construction , 2008, 2008 Winter Simulation Conference.

[21]  Vivian W. Y Tam,et al.  On prefabrication implementation for different project types and procurement methods in Hong Kong , 2007 .

[22]  S. Michael Handbook in research and evaluation , 1971 .

[23]  Kouichi Murayama,et al.  Modularization Technology in Power Plant Construction , 2002 .