MODELLING OF TIME, COST AND RISK OF CONSTRUCTION WITH USING FUZZY LOGIC

The paper presents an overview of the literature from recent years devoted to planning the time, costs and risk of a construction investment using fuzzy logic. It also presents three own original models concerning the issue. The first model is used to build a fuzzy construction schedule taking into account fuzzy norms and the number of workers. The costing model uses fuzzy inference from CBR cases. The aim was to increase the accuracy and correctness of the cost calculation performed for the investor in the construction and investment process with a certain degree of vagueness of the available information about materials. In the last of the presented models, fuzzy sets were used to assess the effects of technological and construction (implementation) risk factors. The presented examples prove the usefulness of fuzzy logic in solving problems in construction, where we have incomplete and imprecise information.

[1]  Anthony Higham,et al.  Latent geotechnical pathogens inducing cost overruns in highway projects , 2017 .

[2]  Rasoul Haji,et al.  A Project Scheduling Method Based on Fuzzy Theory , 2007 .

[3]  Osman Taylan,et al.  Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies , 2014, Appl. Soft Comput..

[4]  E. Plebankiewicz,et al.  Identification of risk factors in the life cycle cost of a building , 2015 .

[5]  Irem Dikmen,et al.  Using fuzzy risk assessment to rate cost overrun risk in international construction projects , 2007 .

[6]  N. Ibadov,et al.  Construction project planning under fuzzy time constraint , 2019, International Journal of Environmental Science and Technology.

[7]  Min-Yuan Cheng,et al.  Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry , 2010, Expert Syst. Appl..

[8]  Shih-Pin Chen,et al.  A simple approach to fuzzy critical path analysis in project networks , 2008 .

[9]  Pawel Zielinski,et al.  Critical path analysis in the network with fuzzy activity times , 2001, Fuzzy Sets Syst..

[10]  Mohammad A. Khalilzadeh,et al.  A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters , 2017 .

[11]  Gin-Shuh Liang,et al.  APPLICATION OF FUZZY CRITICAL PATH METHOD TO AIRPORT'S CARGO GROUND OPERATION SYSTEMS , 2006 .

[12]  Aminah Robinson Fayek,et al.  Use of fuzzy logic for predicting design cost overruns on building projects , 2002 .

[13]  Paijit Pawan,et al.  A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects , 2016 .

[14]  Tarun Bhaskar,et al.  A heuristic method for RCPSP with fuzzy activity times , 2011, Eur. J. Oper. Res..

[15]  Jurgita Antucheviciene,et al.  Solving Civil Engineering Problems by Means of Fuzzy and Stochastic MCDM Methods: Current State and Future Research , 2015 .

[16]  Aminah Robinson Fayek,et al.  Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined Failure Mode and Effect Analysis, Fault Trees, Event Trees, and Fuzzy Logic , 2012 .

[17]  Jurgita Antucheviciene,et al.  A new hybrid fuzzy MCDM approach for evaluation of construction equipment with sustainability considerations , 2018 .

[18]  Edyta Plebankiewicz,et al.  Model of Predicting Cost Overrun in Construction Projects , 2018, Sustainability.

[19]  Soo-Yong Kim,et al.  Construction Cost Overruns in Transmission Grid Projects , 2018 .

[20]  Edmundas Kazimieras Zavadskas,et al.  Application of Fuzzy DEMATEL Method for Analyzing Occupational Risks on Construction Sites , 2017 .

[21]  Yusuf Latief,et al.  PRELIMINARY COST ESTIMATION USING REGRESSION ANALYSIS INCORPORATED WITH ADAPTIVE NEURO FUZZY INFERENCE SYSTEM , 2013 .

[22]  Seyed Hossein Razavi Hajiagha,et al.  Multicriteria group decision making with ELECTRE III method based on interval-valued intuitionistic fuzzy information , 2016 .

[23]  S. Elizabeth,et al.  FUZZY CRITICAL PATH PROBLEM FOR PROJECT NETWORK , 2013 .

[24]  Tien-Fu Liang,et al.  Project management decisions with multiple fuzzy goals , 2004 .

[25]  Edyta Plebankiewicz,et al.  Rozmyta ocena ryzyka w cyklu życia obiektów budowlanych , 2016 .

[26]  Edyta Plebankiewicz,et al.  Multidimensional sensitivity study of the fuzzy risk assessment module in the life cycle of building objects , 2018, Open Engineering.

[27]  Zachary C. Abiero Gariy,et al.  An Effective Approach to Input Variable Selection for Preliminary Cost Estimation of Construction Projects , 2019, Advances in Civil Engineering.

[28]  Madhav Prasad Nepal,et al.  Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects , 2017, Adv. Eng. Informatics.

[29]  E. Plebankiewicz,et al.  Original Model for Estimating the Whole Life Costs of Buildings and its Verification , 2019 .

[30]  Jurgita Antucheviciene,et al.  HYBRID MULTIPLE CRITERIA DECISION MAKING METHODS: A REVIEW OF APPLICATIONS IN ENGINEERING , 2016 .

[31]  Savita Sharma,et al.  Fuzzy assessment of the risk factors causing cost overrun in construction industry , 2019, Evolutionary Intelligence.

[32]  Edyta Plebankiewicz,et al.  Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk , 2019, Sustainability.

[33]  Agnieszka Leśniak,et al.  Cost Calculation of Construction Projects Including Sustainability Factors Using the Case Based Reasoning (CBR) Method , 2018 .

[34]  E. Plebankiewicz,et al.  Creating a Construction Schedule Specyfing Fuzzy Norms and the Number of Workers , 2016 .

[35]  Emad Roghanian,et al.  An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks , 2013 .

[36]  Jurgita Antucheviciene,et al.  Sustainable Decision-Making in Civil Engineering, Construction and Building Technology , 2017 .

[37]  Krzysztof Zima The use of fuzzy case-based reasoning in estimating costs in the early phase of the construction project , 2015 .

[38]  S. Sathish,et al.  A simple approach to fuzzy critical path analysis in project networks , 2011 .

[39]  D. Mohamad,et al.  Fuzzy Jaccard with Degree of Optimism Ranking Index Based on Function Principle Approach , 2010 .

[40]  Damian Wieczorek,et al.  Fuzzy risk assessment in the life cycle of building object - Selection of the right defuzzification method , 2018 .

[41]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[42]  Soo-Yong Kim,et al.  Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects , 2020, KSCE Journal of Civil Engineering.

[43]  Parmpreet Kaur,et al.  A New Method for Fuzzy Critical Path Analysis in Project Networks with a New Representation of Triangular Fuzzy Numbers , 2010 .

[44]  G. Wei,et al.  Extension of VIKOR method for decision making problem based on hesitant fuzzy set , 2013 .

[45]  Edyta Plebankiewicz,et al.  Adaptation of a Cost Overrun Risk Prediction Model to the Type of Construction Facility , 2020, Symmetry.