Completed bases for removable dentures.
暂无分享,去创建一个
A technique for the fabrication of completed bases for removable dentures has been described. The artificial stone mounting casts and completed bases must be kept free of debris at all times to allow for accurate seating of the bases on the casts. The completed bases must be kept in water when not in use between patient appointments.
[1] A. Brewer. Prosthodontic research in progress at the School of Aerospace Medicine , 1963 .
[2] R. Vig. Method of reducing the shifting of teeth in denture processing , 1975 .
[3] K. M. Tucker. Accurate record bases for jaw relation procedures. , 1966, The Journal of prosthetic dentistry.
[4] J. B. Woelfel,et al. Method of evaluating the clinical effect of warping a denture: report of a case. , 1959, Journal of the American Dental Association.