Economics of High-Temperature Nuclear Reactors for Industrial Cogeneration

The EU Emissions Trading Scheme challenges the cost-competitiveness of energy-intensive industries in Europe, and induces them to search for low-carbon alternatives for their process heat requirements, such as cogeneration or the employment of nuclear power plants. The high-temperature nuclear reactor (HTR) is a technology option that combines these two aspects. In this paper, the economic potential of using HTRs for cogeneration of industrial process heat and electricity is studied. We show that a reference case HTR can deliver cost-competitive process heat at temperatures of 200°C and above, rendering the chemical and pulp & paper industry as potential candidates. The economic evaluation of the reference case yields a positive net present value of € 304 million and an internal rate of return of 12.3%, which is above the cost of capital. Real options analysis is employed to account for the uncertain environment and the resulting managerial flexibilities of the project. A real option model for optimal investment timing (Pindyck, 1991) is adapted to HTRs for industrial cogeneration. The value of the option to invest in a HTR is determined at € 667 million and the electricity price threshold for an optimal investment at 78.97 €/MWh. Hence, the option to invest in a HTR represents a significant value for a utility. Yet, the investment should be delayed until the electricity price reaches the threshold value. We also propose a model to calculate the option to switch between two different modes of operation that is based on Kulatilaka and Trigeorgis (1994) but builds on a time-continuous price path instead of a binomial lattice. For the reference case, the option to switch the power plant’s output from cogeneration to electricity only is found to be worth € 85 million.

[1]  Reinhard Madlener,et al.  Portfolio Selection Methods and their Empirical Applicability to Real Assets in Energy Markets , 2011 .

[2]  Joachim Lang,et al.  Relevance of Risk Capital and Margining for the Valuation of Power Plants: Cash Requirements for Credit Risk Mitigation , 2010 .

[3]  Reinhard Madlener,et al.  Evaluation of Different Hedging Strategies for Commodity Price Risks of Industrial Cogeneration Plants , 2013 .

[4]  P. Jean-Jacques Herings,et al.  Communication Network Formation with Link Specificity and Value Transferability , 2010, Eur. J. Oper. Res..

[5]  R. C. Merton,et al.  Theory of Rational Option Pricing , 2015, World Scientific Reference on Contingent Claims Analysis in Corporate Finance.

[6]  R. Madlener,et al.  Evaluation of Economically Optimal Retrofit Investment Options for Energy Savings in Buildings , 2011 .

[7]  Peter J. G. Pearson,et al.  Liberalisation of Germany’s Electricity System and the Ways Forward of the Unbundling Process: A Historical Perspective and an Outlook , 2010 .

[8]  R. Madlener,et al.  Multi-Commodity Real Options Analysis of Power Plant Investments: Discounting Endogenous Risk Structures , 2011 .

[9]  Reinhard Madlener,et al.  Cost-Effectiveness of Lignocellulose Biorefineries and their Impact on the Deciduous Wood Markets in Germany , 2012 .

[10]  Reinhard Madlener,et al.  Investigation of E.ON’s Power Generation Assets by Using Mean-Variance Portfolio Analysis , 2009 .

[11]  Reinhard Madlener,et al.  The Influence of Social Preferences on Multi-Criteria Evaluation of Energy Scenarios , 2008 .

[12]  Gunter Schaumann,et al.  Kraft-Wärme-Kopplung , 2010 .

[13]  Reinhard Madlener,et al.  Integrated Theoretical Framework for a Homeowner's Decision in Favor of an Innovative Residential Heating System , 2010 .

[14]  Bernt Øksendal,et al.  Optimal time to invest when the price processes are geometric Brownian motions , 1998, Finance Stochastics.

[15]  J. Shortle,et al.  Water Quality Trading When Nonpoint Pollution Loads are Stochastic , 2009 .

[16]  Rainer Reimert,et al.  Process heat from modularized HTR , 2012 .

[17]  Reinhard Madlener,et al.  Assessing the Economic Potential of Microdrilling in Geothermal Exploration , 2011 .

[18]  Afzal S. Siddiqui,et al.  How to Proceed with the Thorium Nuclear Technology: a Real Options Analysis ⁄ , 2008 .

[19]  Reinhard Madlener,et al.  The Impact of Disaggregated ICT Capital on Electricity Intensity of Production: Econometric Analysis of Major European Industries , 2008 .

[20]  Reinhard Madlener,et al.  Efficient Investment Portfolios for the Swiss Electricity Supply Sector , 2008 .

[21]  Christian-Simon Ernst,et al.  Optimal Battery Size for Serial Plug-in Hybrid Vehicles: A Model-Based Economic Analysis for Germany , 2010 .

[22]  Reinhard Madlener,et al.  Homeowners' Motivation to Adopt a Residential Heating System: A Principal Component Analysis , 2013 .

[23]  S. Myers Determinants of corporate borrowing , 1977 .

[24]  R. McDonald,et al.  The Value of Waiting to Invest , 1982 .

[25]  Reinhard Madlener,et al.  Relating R&D and Investment Policies to CCS Market Diffusion Through Two-Factor Learning , 2010 .

[26]  Reinhard Madlener,et al.  Residential Natural Gas Demand Elasticities in OECD Countries: An ARDL Bounds Testing Approach , 2011 .

[27]  Reinhard Madlener,et al.  Using Fuzzy Real Options Valuation for Assessing Investments in NGCC and CCS Energy Conversion Technology , 2009 .

[28]  Reinhard Madlener,et al.  Homeowners’ Preferences for Adopting Residential Heating Systems: A Discrete Choice Analysis for Germany , 2011 .

[29]  Martin Achtnicht,et al.  Factors Influencing German House Owners' Preferences on Energy Retrofits , 2012 .

[30]  Reinhard Madlener,et al.  Development Trends and Economics of Innovative Solar Power Generation Technologies: A Comparative Analysis , 2009 .

[31]  Reinhard Madlener,et al.  Investment in New Power Generation Under Uncertainty: Benefits of CHP vs. Condensing Plants in a Copula-Based Analysis , 2010 .

[32]  Martin Achtnicht,et al.  Do Environmental Benefits Matter? A Choice Experiment Among House Owners in Germany , 2010 .

[33]  P. Herings,et al.  Behavioral Effects in Individual Decisions of Network Formation , 2008 .

[34]  Reinhard Madlener,et al.  Economic Evaluation of IGCC Plants with Hot Gas Cleaning , 2010 .

[35]  A. Kwasnica,et al.  A Laboratory Experiment to Compare Two Market Institutions for Emissions Trading , 2010 .

[36]  Reinhard Madlener,et al.  Impact of Plug-in Hybrid Electric Vehicles and Charging Regimes on Power Generation Costs and Emissions in Germany , 2010 .

[37]  Reinhard Madlener,et al.  Appliance Endowment and User Behaviour by Age Group: Insights from a Swiss Micro-Survey on Residential Electricity Demand , 2010 .

[38]  Alexander Mielke,et al.  A Rate-Independent Model for Inelastic Behavior of Shape-Memory Alloys , 2003, Multiscale Model. Simul..

[39]  Reinhard Madlener,et al.  Sustainable energy development in Austria until 2020: Insights from applying the integrated model “e3.at” , 2011, Energy policy.

[40]  G. Rothwell A real options approach to-evaluating new nuclear power plants , 2006 .

[41]  Reinhard Madlener,et al.  Valuation of CCS-ready coal-fired power plants: a multi-dimensional real options approach , 2011 .

[42]  Reinhard Madlener,et al.  Modeling the Influence of Network Externalities and Quality on Market Shares of Plug-in Hybrid Vehicles , 2011 .

[43]  Joachim Lang,et al.  Cost Evaluation of Credit Risk Securitization in the Electricity Industry: Credit Default Acceptance vs. Margining Costs , 2010 .

[44]  Reinhard Madlener,et al.  Promoting Renewable Electricity Generation in Imperfect Markets: Price vs. Quantity Policies , 2008 .

[45]  R. Madlener,et al.  The Impact of Wind Farms on Property Values: A Geographically Weighted Hedonic Pricing Model , 2012 .

[46]  Reinhard Madlener,et al.  Cost Effectiveness of Carbon Capture-Ready Coal Power Plants with Delayed Retrofit , 2010 .

[47]  Reinhard Madlener,et al.  Simulation of the European Electricity Market and CCS Development with the HECTOR Model , 2009 .

[48]  Reinhard Madlener,et al.  An auction design for local reserve energy markets , 2013, Decis. Support Syst..

[49]  Zuoyi Zhang,et al.  Economic potential of modular reactor nuclear power plants based on the Chinese HTR-PM project , 2007 .

[50]  R. Pindyck Irreversibility, Uncertainty, and Investment , 1990 .

[51]  Eduardo S. Schwartz,et al.  Evaluating Natural Resource Investments , 1985 .

[52]  Reinhard Madlener,et al.  Towards an Efficient and Low-Carbon Economy Post-2012: Opportunities and Barriers for Foreign Companies in the Russian Market , 2011 .

[53]  Reinhard Madlener,et al.  Responsiveness of Residential Electricity Demand in OECD Countries: A Panel Cointegation and Causality Analysis , 2011 .

[54]  Reinhard Madlener,et al.  Rebound Effects in German Residential Heating: Do Ownership and Income Matter? , 2011 .

[55]  Energieökonomik: Theorie und Anwendungen , 2008 .

[56]  Reinhard Madlener,et al.  Development of Cogeneration in Germany: A Dynamic Portfolio Analysis Based on the New Regulatory Framework , 2009 .

[57]  Reinhard Madlener,et al.  Fuzzy Portfolio Optimization of Onshore Wind Power Plants , 2014 .

[58]  Eduardo S. Schwartz,et al.  Investment Under Uncertainty. , 1994 .

[59]  P. Herings,et al.  The Structure of Online Consumer Communication Networks , 2006 .

[60]  Reinhard Madlener,et al.  Russia’s Emerging ESCO Market: Prospects and Barriers for Energy Efficiency Investments , 2012 .

[61]  Reinhard Madlener,et al.  Renewable Energy Policy in the Presence of Innovation: Does Government Pre-Commitment Matter? , 2010 .

[62]  Reinhard Madlener,et al.  Assessment of the Technological Development and Economic Potential of Photobioreactors , 2009 .

[63]  Christian Gollier,et al.  Choice of Nuclear Power Investments under Price Uncertainty: Valuing Modularity , 2005 .

[64]  Reinhard Madlener,et al.  Centralized and Integrated Decentralized Compressed Air Energy Storage for Enhanced Grid Integration of Wind Power , 2010 .

[65]  R. Madlener,et al.  Dynamic Portfolio Selection Methods for Power Generation Assets , 2011 .

[66]  Paul L. Fackler Solving Optimal Switching Models , 2004 .

[67]  Reinhard Madlener,et al.  The Benefit of Regional Diversification of Cogeneration Investments in Europe: A Mean-Variance Portfolio Analysis , 2009 .

[68]  F. Black,et al.  The Pricing of Options and Corporate Liabilities , 1973, Journal of Political Economy.

[69]  B. Øksendal,et al.  Optimal Switching in an Economic Activity Under Uncertainty , 1994 .

[70]  Reinhard Madlener,et al.  Pan-European Management of Electricity Portfolios: Risks and Opportunities of Contract Bundling , 2010 .

[71]  Reinhard Madlener,et al.  A Spatial MAS Simulation to Evaluate the Promotion of Electricity from Agricultural Biogas Plants in Germany , 2011 .

[72]  Reinhard Madlener,et al.  Optimal Time to Start Serial Production: The Case of the Direct Drive Wind Turbine of Siemens Wind Power A/S , 2011 .

[73]  Reinhard Madlener,et al.  Impact of CCS on the Economics of Coal-Fired Power Plants: Why Investment Costs Do and Efficiency Doesn’t Matter , 2009 .

[74]  Reinhard Madlener,et al.  Economic Assessment of a Concentrating Solar Power Forecasting System for Participation in the Spanish Electricity Market , 2011 .

[75]  T. Copeland Real Options: A Practitioner's Guide , 2001 .

[76]  Fernando Carriazo,et al.  A Comparison of Three Methods of Estimation in the Context of Spatial Modeling , 2009 .

[77]  J. Shortle,et al.  Managing Pollution Risk Through Emissions Trading , 2012 .

[78]  Bilge Yildiz,et al.  Nuclear hydrogen : an assessment of product flexibility and market viability. , 2008 .

[79]  William J. Nuttall,et al.  Nuclear Power: A Hedge against Uncertain Gas and Carbon Prices? , 2006 .

[80]  L. Trigeorgis,et al.  The General Flexibility to Switch: Real Options Revisited , 2000 .

[81]  Gaurav S. Ghosh,et al.  Do Baseline Requirements hinder Trades in Water Quality Trading Programs , 2009 .

[82]  Reinhard Madlener,et al.  Why Higher Price Sensitivity of Consumers May Increase Average Prices: An Analysis of the European Electricity Market , 2010 .

[83]  R. Pindyck Investments of Uncertain Cost , 1992 .

[84]  Reinhard Madlener,et al.  Economics of Biomass Co-Firing in New Hard Coal Power Plants in Germany , 2012 .

[85]  R. Voeks Real Options: Managerial Flexibility and Strategy in Resource Allocation , 1997 .

[86]  Reinhard Madlener,et al.  Repowering of Wind Turbines: Economics and Optimal Timing , 2012 .

[87]  Stanley B. Block Are “Real Options” Actually Used in the Real World? , 2007 .

[88]  Reinhard Madlener,et al.  Electricity Consumption of an Ageing Society: Empirical Evidence from a Swiss Household Survey , 2010 .

[89]  Reinhard Madlener,et al.  Consumer Preferences for Alternative Fuel Vehicles: A Discrete Choice Analysis , 2012 .

[90]  Joachim Lang,et al.  Portfolio Optimization for Power Plants: The Impact of Credit Risk Mitigation and Margining , 2010 .

[91]  C. Oosterlee,et al.  Optimal Investment in Modular Reactors in a Finite Time Decision Horizon , 2011 .

[92]  R. Madlener,et al.  Power Plant Investments in the Turkish Electricity Sector: A Real Options Approach Taking into Account Market Liberalization , 2011 .

[93]  Reinhard Madlener,et al.  The Impact of Modified EU ETS Allocation Principles on the Economics of CHP-Based District Heating Networks , 2011 .

[94]  Eriko Kiriyama,et al.  Use of Real Options in Nuclear Power Plant Valuation in the Presence of Uncertainty with CO2 Emission Credit , 2004 .

[95]  Reinhard Madlener,et al.  Impact of ICT and Human Skills on the European Financial Intermediation Sector , 2008 .