Beam commissioning and first operation of the ISAC DTL at TRIUMF
暂无分享,去创建一个
K. Fong | G. Dutto | R. Ruegg | M. Pasini | K. Fong | R. Laxdal | R. Ruegg | R.E. Laxdal | G. Mackenzie | M. Pasini | R. Poirier | G. Mackenzie | G. Dutto | R. Poirier
[1] R. Baartman,et al. Beam test results with the ISAC 35 MHz RFQ , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
[2] Y. Bylinsky,et al. Development, fabrication and test of triple gap split-ring bunchers for the TRIUMF ISAC facility , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[3] R. Laxdal,et al. A separated function drift-tube linac for the ISAC project at TRIUMF , 1997, Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167).
[4] K. Fong,et al. RF measurement summary of ISAC DLT tanks and DTL bunchers , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[5] W.R.Rawnsley,et al. FIRST BEAM TEST WITH THE ISAC SEPARATED FUNCTION DTL , 2000 .
[6] R. Laxdal. Completion and operations of ISAC-I and extension to ISAC-II , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[7] K. Fong,et al. CW performance of the TRIUMF 8 meter long RFQ for exotic ions , 2000 .