Delivery risk analysis within the context of program management using fuzzy logic and DEA: A China case study

Abstract The last decades witnessed an increasing number of large construction programs, which have presented a large number of extra risks in terms of management. This is due to the unique characteristics of programs compared to traditional projects. On the basis of definition of a construction program, a mixed approach was employed in this study to explore the management of delivery risk of a construction program. The main contents include (1) build a delivery risk structure for a construction program as the foundation of risk qualitative and quantitative analysis; (2) analyze risk magnitude and assess the efficiency of delivery methods by using fuzzy logic theory and DEA; (3) conduct a case study of the 2010 Guangzhou Asian Games as an example of construction programs to apply and verify the mixed delivery risk assessment approach developed in this study. The result shows that the separate contracting delivery method which was planned to be used for the 2010 Guangzhou Asian Games is not the best choice, which needs to be improved based on the principles of PM contracting and partner contracting. The mixed approach used in the case study can be employed by practitioners to select an optimal delivery method for other construction programs.

[1]  Joseph H. M. Tah,et al.  Knowledge-Based Approach to Construction Project Risk Management , 2001 .

[2]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[3]  Amedeo Reyneri,et al.  A dynamic risk assessment model (FUMAgrain) of fumonisin synthesis by Fusarium verticillioides in maize grain in Italy , 2009 .

[4]  Hans Hellendoorn,et al.  Defuzzification in Fuzzy Controllers , 1993, J. Intell. Fuzzy Syst..

[5]  W. Cooper,et al.  Data Envelopment Analysis: A Comprehensive Text with Models, Applications, References and DEA-Solver Software , 1999 .

[6]  He-Yau Kang,et al.  A DEA window analysis on the product family mix selection for a semiconductor fabricator , 2008, Expert Syst. Appl..

[7]  Arwin van Buuren,et al.  Program management and the creative art of coopetition: Dealing with potential tensions and synergies between spatial development projects , 2010 .

[8]  Ibrahim M. Mahdi,et al.  Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .

[9]  Enrico Zio,et al.  Some considerations on the treatment of uncertainties in risk assessment for practical decision making , 2011, Reliab. Eng. Syst. Saf..

[10]  Christopher M. Gordon,et al.  Choosing Appropriate Construction Contracting Method , 1994 .

[11]  K. T. Yeo,et al.  Risk management capability maturity model for complex product systems (CoPS) projects , 2009 .

[12]  S. Thomas Ng,et al.  A case-based procurement advisory system for construction , 2003 .

[13]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[14]  Graham Winch,et al.  Escalation in major projects: Lessons from the Channel Fixed Link , 2013 .

[15]  Danny C. K. Ho,et al.  Design and Build Project Success Factors: Multivariate Analysis , 2001 .

[16]  Denise Bower,et al.  Construction client multi-projects – A complex adaptive systems perspective , 2009 .

[17]  Arazi Idrus,et al.  Development of project cost contingency estimation model using risk analysis and fuzzy expert system , 2011, Expert Syst. Appl..

[18]  Abraham Charnes,et al.  Measuring the efficiency of decision making units , 1978 .

[19]  S. Stinson BODY OF KNOWLEDGE , 1995 .

[20]  Jon A Arnot,et al.  Screening level risk assessment model for chemical fate and effects in the environment. , 2006, Environmental science & technology.

[21]  Sergio Pellegrinelli,et al.  What’s in a name: Project or programme? , 2011 .

[22]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[23]  Andrew W Gale,et al.  The development and delivery of an industry led project management professional development programme: A case study in project management education and success management , 2008 .

[24]  Albert P.C. Chan,et al.  Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach , 2010 .

[25]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[26]  Mark Lycett,et al.  Programme management: a critical review , 2004 .

[27]  S. El-Sayegh Risk assessment and allocation in the UAE construction industry , 2008 .

[28]  G C Barker,et al.  Strengths and weaknesses of Monte Carlo simulation models and Bayesian belief networks in microbial risk assessment. , 2010, International journal of food microbiology.

[29]  Michel Thiry,et al.  Combining value and project management into an effective programme management model , 2002 .

[30]  Irem Dikmen,et al.  Using fuzzy risk assessment to rate cost overrun risk in international construction projects , 2007 .

[31]  Mark Winter,et al.  Projects and programmes as value creation processes: A new perspective and some practical implications , 2008 .

[32]  A. Charnes,et al.  Data Envelopment Analysis Theory, Methodology and Applications , 1995 .

[33]  Timothy Coelli,et al.  An Introduction to Efficiency and Productivity Analysis , 1997 .

[34]  She-I Chang,et al.  The development of audit detection risk assessment system: Using the fuzzy theory and audit risk model , 2008, Expert Syst. Appl..

[35]  Zayyana Shehu,et al.  Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis , 2010 .

[36]  Sergio Pellegrinelli,et al.  Programme management: organising project-based change , 1997 .

[37]  M. Sam Mannan,et al.  An uncertainty and sensitivity analysis of dynamic operational risk assessment model: A case study , 2010 .

[38]  Zayyana Shehu,et al.  Construction programme management theory and practice: Contextual and pragmatic approach , 2009 .

[39]  Ossi Pesämaa,et al.  Validating a Model of Cooperative Procurement in the Construction Industry , 2009 .

[40]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  Appropriate or default project procurement systems , 1999 .

[41]  George Zillante,et al.  Exploring the management of sustainable construction at the programme level: a Chinese case study , 2012 .

[42]  Rui Ren,et al.  Expressway Extension Project Construction Management Based on the Programme , 2009, 2009 International Conference on Management and Service Science.

[43]  Rita Almeida Ribeiro,et al.  Qualitative Model for Risk Assessment in Construction Industry: A Fuzzy Logic Approach , 2010, DoCEIS.

[44]  Qing Cao,et al.  A case study approach for developing a project performance evaluation system , 2011 .