Design and scheduling of flexible assembly lines for printed circuit boards
暂无分享,去创建一个
[1] David G. Dannenbring,et al. An Evaluation of Flow Shop Sequencing Heuristics , 1977 .
[2] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[3] Em Dar-El,et al. Optimal mixed-model sequencing for balanced assembly lines , 1977 .
[4] Stephen D. Roberts,et al. ON A MULTI-PRODUCT ASSEMBLY LINE BALANCING PROBLEM. , 1969 .
[5] Ezey M. Dar-El,et al. Mixed-model assembly line sequencing problems , 1978 .
[6] Richard Bellman,et al. Mathematical Aspects Of Scheduling And Applications , 1982 .
[7] Z. A. Lomnicki. A “Branch-and-Bound” Algorithm for the Exact Solution of the Three-Machine Scheduling Problem , 1965 .
[8] S. D. Roberts,et al. On a Multiproduct Assembly Line-Balancing Problem , 1970 .
[9] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[10] N. A. J. Hastings,et al. A New Bound for Machine Scheduling , 1976 .
[11] Kenichi Sekine. One-Piece Flow : Cell Design for Transforming the Production Process , 1992 .
[12] E. M. Dar-El,et al. A mixed-model sequencing application , 1981 .
[13] Nick T. Thomopoulos,et al. Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .
[14] Jatinder N. D. Gupta,et al. A Functional Heuristic Algorithm for the Flowshop Scheduling Problem , 1971 .
[15] A. Chakravarty,et al. Balancing Mixed Model Lines with In-Process Inventories , 1985 .
[16] Arnoldo C. Hax,et al. Production and inventory management , 1983 .
[17] David D. Bedworth. Industrial systems: planning, analysis, control , 1973 .
[18] Maurice Bonney,et al. Solutions to the Constrained Flowshop Sequencing Problem , 1976 .
[19] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[20] C. Dennis Pegden,et al. A survey and evaluation of static flowshop scheduling heuristics , 1984 .
[21] J. L. C. Macaskill,et al. Computer Simulation for Mixed-Model Production Lines , 1973 .
[22] J. Temple Black,et al. The design of the factory with a future , 1991 .
[23] A. S. Spachis,et al. Heuristics for flow-shop scheduling , 1980 .
[24] E. Ignall,et al. Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems , 1965 .
[25] D. S. Palmer. Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum , 1965 .
[26] Gabriel R. Bitran,et al. OR Practice - Development and Implementation of a Scheduling System for a Wafer Fabrication Facility , 1988, Oper. Res..
[27] Ezey M. Dar-El,et al. Assembly line sequencing for model mix , 1975 .
[28] L. Gelders,et al. Four simple heuristics for scheduling a flow-shop , 1978 .
[29] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[30] William L. Maxwell,et al. Theory of scheduling , 1967 .
[31] M. Kilbridge,et al. The Balance Delay Problem , 1961 .
[32] J. L. C. Macaskill,et al. Production-Line Balances for Mixed-Model Lines , 1972 .
[33] Kenjiro Okamura,et al. A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor , 1979 .