The role of CO2-EOR for the development of a CCTS infrastructure in the North Sea Region

[1]  Mads Greaker,et al.  Carbon capture and storage technologies in the European power market , 2011 .

[2]  Thomas L. Magnanti,et al.  Network Design and Transportation Planning: Models and Algorithms , 1984, Transp. Sci..

[3]  Ton Wildenborg,et al.  Scenario for large-scale implementation of CCS in Europe , 2009 .

[4]  M. J. Fetkovich Decline Curve Analysis Using Type Curves , 1980 .

[5]  Evangelos Tzimas,et al.  Optimised deployment of a European CO2 transport network , 2012 .

[6]  Steven C. Hackett Pollution-Controlling Innovation in Oligopolistic Industries: Some Comparisons between Patent Races and Research Joint Ventures , 1995 .

[7]  B. Tohidi,et al.  CO2 Eor and Storage in Oil Reservoir , 2005 .

[8]  Christian von Hirschhausen,et al.  How a "Low Carbon" Innovation Can Fail--Tales from a "Lost Decade" for Carbon Capture, Transport, and Sequestration (CCTS) , 2012 .

[9]  Knut Einar Rosendahl,et al.  Effects of Liberalizing the Natural Gas Markets in Western Europe* , 1995 .

[10]  Richard S. Middleton,et al.  A comprehensive carbon capture and storage infrastructure model , 2009 .

[11]  Edgar G. Hertwich,et al.  Life-cycle Assessment of Carbon Dioxide Capture for Enhanced Oil Recovery , 2008 .

[12]  Franziska Holz,et al.  The World Gas Model: A Multi-Period Mixed Complementarity Model for the Global Natural Gas Market , 2009 .

[13]  C. Mason,et al.  Co-Optimization of Enhanced Oil Recovery and Carbon Sequestration , 2009 .

[14]  Pao-Yu Oei,et al.  CCTS-Technologie ein Fehlschlag: Umdenken in der Energiewende notwendig , 2012 .

[15]  Asgeir Tomasgard,et al.  Optimizing a CO2 value chain for the Norwegian Continental Shelf , 2010 .

[16]  Dan Olsen,et al.  CO2 EOR Production Properties of Chalk , 2011 .

[17]  Andrea Ramírez,et al.  Comparative assessment of CO2 capture technologies for carbon-intensive industrial processes , 2012 .

[18]  Filip Johnsson,et al.  Establishing an integrated CCS transport infrastructure in northern Europe–Challenges and possibilities , 2011 .

[19]  Clemens Gerbaulet,et al.  In Ruhe planen: Netzausbau in Deutschland und Europa auf den Prüfstand , 2012 .

[20]  S. Gabriel,et al.  A Generalized Nash–Cournot Model for the Northwestern European Natural Gas Markets with a Fuel Substitution Demand Function: The GaMMES Model , 2013 .

[21]  Edward S. Rubin,et al.  Use of experience curves to estimate the future cost of power plants with CO2 capture , 2007 .

[22]  Steven A. Gabriel,et al.  The World Gas Model , 2010 .

[23]  William D. Gunter,et al.  Net CO2 Stored in North American EOR Projects , 2010 .

[24]  Benjamin F. Hobbs,et al.  Network-constrained Cournot models of liberalized electricity markets: the devil is in the details , 2005 .

[25]  Rod Sloan,et al.  Quantification of Uncertainty in Recovery Efficiency Predictions: Lessons Learned from 250 Mature Carbonate Fields , 2003 .

[26]  Rajesh J. Pawar,et al.  Jumpstarting CCS using refinery CO2 for enhanced oil recovery , 2011 .

[27]  Dag Wessel-Berg,et al.  EOR and CO2 disposal — Economic and capacity potential in the North Sea , 2009 .

[28]  Heleen Groenenberg,et al.  Large-scale CCS transport and storage networks in North-west and Central Europe , 2011 .

[29]  Richard S. Middleton,et al.  Generating candidate networks for optimization: The CO2 capture and storage optimization problem , 2012, Comput. Environ. Urban Syst..

[30]  Vello Kuuskraa,et al.  CO2 storage in depleted oil fields: The worldwide potential for carbon dioxide enhanced oil recovery , 2011 .