A study of the optimal production strategy for hybrid production systems

Due to increased environmental awareness, the issue of recycling and disassembling damaged or malfunctioning products after consumption to obtain useable parts for remanufacturing has become essential. This study considers a hybrid production system with both external and internal reverse logistics in which the external recycled products are utilised for remanufacturing to satisfy demand first, and then the ordinary manufacturing process may supplement this if there is any shortage in production. In addition, the defective items produced internally by either the manufacturing or the remanufacturing process can also be repaired by a remediation process. The objective of this study is to determine the optimal strategy for the manufacturing, remanufacturing, disposal, and remediation rates. Three conditions are considered in which the production strategy varies with different yield rates and capacity limits. The impacts of related factors on the production strategy are investigated to probe the trade-offs between product consumption and environmental protection.

[1]  Refik Güllü,et al.  A model to evaluate inventory costs in a remanufacturing environment , 2003 .

[2]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[3]  Gp Gudrun Kiesmüller Optimal control of a one product recovery system with leadtimes , 2003 .

[4]  Imre Dobos,et al.  Optimal production-inventory strategies for a HMMS-type reverse logistics system , 2003 .

[5]  Marija Bogataj,et al.  On the compact presentation of the lead times perturbations in distribution networks , 2004 .

[6]  Simme Douwe Flapper,et al.  Product recovery in stochastic remanufacturing systems with multiple reuse options , 2001, Eur. J. Oper. Res..

[7]  Carsten W. Scherer,et al.  Computational issues in a stochastic finite horizon one product recovery inventory model , 2003, Eur. J. Oper. Res..

[8]  Gp Gudrun Kiesmüller,et al.  An inventory model with dependent product demands and returns , 2001 .

[9]  Patroklos Georgiadis,et al.  The effect of environmental parameters on product recovery , 2004, Eur. J. Oper. Res..

[10]  Rainer Kleber,et al.  Optimal control of production and remanufacturing in a simple recovery model with linear cost functions , 2001, OR Spectr..

[11]  K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes , 1997 .

[12]  Toyokazu Nose,et al.  Analysis of a product recovery system , 2002 .

[13]  Dimitrios Vlachos,et al.  Production , Manufacturing and Logistics Return handling options and order quantities for single period products , 2003 .

[14]  Benjamin Melamed,et al.  Modeling and Analysis of Reverse Logistics , 2012 .

[15]  Ronald S. Tibben-Lembke Life after death: reverse logistics and the product life cycle , 2002 .

[16]  Ronald S. Tibben-Lembke,et al.  AN EXAMINATION OF REVERSE LOGISTICS PRACTICES , 2001 .

[17]  Rommert Dekker,et al.  An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies , 1999, Eur. J. Oper. Res..

[18]  Vaidyanathan Jayaraman,et al.  The effect of lead time variation on the performance of disassembly release mechanisms , 1999 .

[19]  Shad Dowlatshahi,et al.  Developing a Theory of Reverse Logistics , 2000, Interfaces.

[20]  Geraldo Ferrer,et al.  Value of information in remanufacturing complex products , 2004 .

[21]  Ping Yang,et al.  Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs , 1996 .

[22]  E. A. van deLaan,et al.  Production planning and inventory control with remanufacturing and disposal , 1997 .

[23]  Gp Gudrun Kiesmüller,et al.  A continuous time inventory model for a product recovery system with multiple options , 2002 .

[24]  Rajesh Srivastava,et al.  Priority scheduling policies for repair shops , 2000 .

[25]  S. Minner Strategic safety stocks in reverse logistics supply chains , 2001 .

[26]  Ali M. Zargar,et al.  Effect of rework strategies on cycle time , 1995 .

[27]  K. Richter,et al.  An extended production/recycling model with stationary demand and return rates , 2004 .

[28]  Geraldo Ferrer On the widget remanufacturing operation , 2001, Eur. J. Oper. Res..

[29]  Erwin van der Laan,et al.  Leadtime effects and policy improvement for stochastic inventory control with remanufacturing , 2001 .

[30]  Simme Douwe P. Flapper,et al.  Logistic planning of rework with deteriorating work-in-process , 2004 .

[31]  Geraldo Ferrer Yield information and supplier responsiveness in remanufacturing operations , 2003, Eur. J. Oper. Res..

[32]  W. C. Benton,et al.  Supply-Chain Management for Recoverable Manufacturing Systems , 2000, Interfaces.

[33]  Gudrun P. Kiesmüller,et al.  A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes , 2003, Eur. J. Oper. Res..

[34]  Ronald S. Tibben-Lembke,et al.  Going Backwards: Reverse Logistics Trends and Practices , 1999 .