OPTIMAL POLICY FOR A SIMPLE SUPPLY CHAIN SYSTEM WITH DEFECTIVE ITEMS AND RETURNED COST UNDER SCREENING ERRORS
暂无分享,去创建一个
[1] Roger M. Hill,et al. The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .
[2] S. Papachristos,et al. Economic ordering quantity models for items with imperfect quality , 2006 .
[3] H. Wee,et al. Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach , 2000 .
[4] Suresh Kumar Goyal,et al. An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .
[5] Udo Buscher,et al. Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..
[6] Seung-Lae Kim,et al. Implementation of JIT purchasing: An integrated approach , 1997 .
[7] HsuPing-Hui,et al. Optimal ordering decision for deteriorating items with expiration date and uncertain lead time , 2007 .
[8] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[9] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .
[10] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[11] Xin Zhang,et al. Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .
[12] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[13] Hui-Ming Wee,et al. Optimal ordering decision for deteriorating items with expiration date and uncertain lead time , 2007, Comput. Ind. Eng..
[14] Chao-Kuei Huang. An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration , 2004 .
[15] Suresh Kumar Goyal,et al. A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .
[16] B. Maddah,et al. Economic order quantity for items with imperfect quality: Revisited , 2008 .
[17] Suresh Kumar Goyal,et al. A one-vendor multi-buyer integrated inventory model: A comment , 1995 .
[18] Liang-Yuh Ouyang,et al. Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..
[19] Ronald Bogaschewsky,et al. Optimizing multi-stage production with constant lot size and varying number of unequal sized batches , 2001 .
[20] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[21] R. Hill. The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .
[22] S. Viswanathan,et al. Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..
[23] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[24] L. Cárdenas-Barrón,et al. Note on: Economic production quantity model for items with imperfect quality – a practical approach , 2002 .
[25] M. Darwish,et al. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..
[26] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[27] Kun-Jen Chung. A necessary and sufficient condition for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration , 2008 .
[28] R L Schwaller. EOQ UNDER INSPECTION COSTS , 1988 .
[29] Liang-Hsuan Chen,et al. Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments , 2007, Eur. J. Oper. Res..
[30] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .