PIP-II Injector Test: Challenges and Status
暂无分享,去创建一个
V. Lebedev | Alexander Shemyakin | Lionel Prost | Jonathan Edelen | P. F. Derwent | A. Saini | J. Steimel | J. P. Carneiro | A. Saini | P. Derwent | V. Lebedev | J. Carneiro | L. Prost | A. Shemyakin | J. Edelen | J. Steimel
[1] V. Scarpine,et al. Pxie low energy beam transport commissioning , 2015, 1511.01479.
[2] J Santos,et al. A Proposed Framework For Planning Deactivation And Decommissioning Engineering And Design Activities To Meet The Requirements Of DOE Order 413.3A, Program And Project Management For The Acquisition Of Capital Assets , 2007 .
[3] J. Carneiro,et al. Low Emittance Growth in a LEBT with Un-Neutralized Section , 2016, 1805.01920.
[4] John Staples,et al. Beam Commissioning Status and Results of the FNAL PIP2IT Linear Accelerator RFQ , 2017 .
[5] A.V.Aleks,et al. EXPERIMENTAL STUDY OF THE SNS MEBT CHOPPER PERFORMANCE , 2010 .
[6] W. Schappert. Resonance Control for Future Linear Accelerators , 2017 .