Analysis of a conceptual automated rework facility for printed wiring assembly manufacturing systems

An analysis of a conceptual automated rework facility for use in a printed wiring assembly (PWA) manufacturing system is presented. The current manual rework system is considered as well as a conceptual automated rework facility. The total cost of rework is decomposed into a diagnostic cost and a rework cost. The reduction of this total cost is the goal of the automated facility. >

[1]  Ray P. Prasad Surface Mount Technology , 1988 .

[2]  Richard L. Kegg,et al.  Development and Performance of an Aerospace Flexible Automated Electronic Component Assembly Cell , 1984 .

[3]  Gideon Halevi,et al.  On Line Scheduling for Flexible Manufacturing Systems , 1984 .

[4]  J. Brimson,et al.  Cost Management for Today’s Advanced Manufacturing , 1988 .

[5]  Stanley B. Gershwin,et al.  Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.

[6]  G. Boothroyd,et al.  Assembly of Non-Standard Electrical Components Using Stereoscopic Image Processing Techniques , 1985 .

[7]  E. F. Brigham,et al.  Financial Management: Theory and Practice , 1990 .

[8]  M. R. Driels,et al.  Cost and performance analysis of printed circuit board manufacture using surface mount devices , 1989 .

[9]  M.R. Driels,et al.  Analysis of printed wiring board assembly systems , 1988, Fifth IEEE/CHMT International Electronic Manufacturing Technology Symposium, 1988, 'Design-to-Manufacturing Transfer Cycle.

[10]  Oded Maimon,et al.  Proposed Scheduling Methods for Printed Circuit Board Assembly , 1988 .

[11]  C. Lea,et al.  A scientific guide to surface mount technology , 1988 .

[12]  B. F. von Turkovich,et al.  Design for Manufacturability of Printed Circuit Board Assemblies , 1985 .

[13]  Stephen W. Hinch,et al.  Handbook of Surface Mount Technology , 1988 .

[14]  G. Boothroyd Economics of General-Purpose Assembly Robots , 1984 .

[15]  Stephen McClelland,et al.  Surface Mount Technology: The Future of Electronics Assembly , 1987 .

[16]  Gilbert W. Curl Mechanical Design Automation in IBM Poughkeepsie , 1981, 18th Design Automation Conference.

[17]  Jan J. Tuma,et al.  Engineering Mathematics Handbook , 1970 .

[18]  Mike Mills A Totally Integrated Systems Approach to Design and Manufacturing at McDonnell Douglas Corporation , 1981, 18th Design Automation Conference.