Key knowledge factors in Thai construction practice

Abstract This research has mainly focused on the practice of knowledge management in Thai construction projects at the on-site work level. The main objective was to identify whether or not knowledge factors influence on-site execution of works. A combination of qualitative and quantitative approaches was employed. The focus group interview with 16 construction managers was conducted to gather in-depth information related to practice of project knowledge management. This data was used to develop the questionnaire to explore key knowledge factors. The questionnaire was sent to 103 participants in 70 construction projects in Thailand. The survey data were analyzed by factor analytic techniques to identify key knowledge factors influencing on-site construction works. The findings showed that there were six key knowledge factors: (1) visionary leadership, (2) reward or incentive, (3) collaboration, (4) trust, (5) information technology, and (6) individual competency or skills.

[1]  Rodney McAdam,et al.  Exploring the dichotomies within the tacit knowledge literature: towards a process of tacit knowing in organizations , 2007, J. Knowl. Manag..

[2]  Andrew R.J. Dainty,et al.  Competency-Based Model for Predicting Construction Project Managers Performance , 2005 .

[3]  Karl-Erik Sveiby,et al.  Collaborative climate and effectiveness of knowledge work - an empirical study , 2002, J. Knowl. Manag..

[4]  Heeseok Lee,et al.  Knowledge Management Enablers, Processes, and Organizational Performance: An Integrative View and Empirical Examination , 2003, J. Manag. Inf. Syst..

[5]  N. Lackey,et al.  Making Sense of Factor Analysis , 2003 .

[6]  M. Polanyi Chapter 7 – The Tacit Dimension , 1997 .

[7]  I. Nonaka,et al.  Enabling Knowledge Creation , 2000 .

[8]  Alexandre A Ardichvili,et al.  Tacit knowledge in professional practice , 2000 .

[9]  Albert H. Segars,et al.  Knowledge Management: An Organizational Capabilities Perspective , 2001, J. Manag. Inf. Syst..

[10]  Peter W. G. Morris,et al.  Practitioner development: From trained technicians to reflective practitioners , 2006 .

[11]  Norman Mooradian,et al.  Tacit knowledge: philosophic roots and role in KM , 2005, J. Knowl. Manag..

[12]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[13]  Tayyab Maqsood,et al.  A QUALITATIVE APPROACH IN PROBLEM SOLVING PROCESS TRACING OF CONSTRUCTION SITE ENGINEERS , 2001 .

[14]  Haridimos Tsoukas,et al.  Do we really understand tacit knowledge , 2002 .

[15]  Francis Tekyi Edum-Fotwe,et al.  Developing project management competency: perspectives from the construction industry , 2000 .

[16]  Marjorie A. Lyles,et al.  The Blackwell handbook of organizational learning and knowledge management , 2003 .

[17]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[18]  H. D. Thomas,et al.  SUCCESSFUL KNOWLEDGE MANAGEMENT PROJECTS , 1998 .

[19]  Marja Naaranoja,et al.  Strategic management tools in projects case construction project , 2007 .

[20]  Yukika Awazu,et al.  Informal network players, knowledge integration, and competitive advantage , 2004, J. Knowl. Manag..

[21]  P. Olomolaiye,et al.  Factors and procedures used in matching project managers to construction projects in Bangkok , 2002 .