Indicators of collaborative design management in construction projects

Design management plays a significant role in value creation in a construction project. Within the last few decades, new design tools such as building information model have been introduced, which supposedly enhance design productivity and quality. However, no such revolution of design quality has emerged. Therefore, more research on how design management affects the quality of construction project is needed. The purpose of this paper is to better understand the connection between design management procedures and quality.,This is a case study with a mixed-method approach. The data collection strategies used are quantitative user satisfaction survey and qualitative analysis over the documentation of the case project.,A deductive analysis was conducted to four suggested indicators of beneficial collaboration. An explanation was found for how the quality of the project outcome can be forecasted from the management style and procedures.,The research was conducted as single case study, and therefore, greater data would enable further development of the indicators.,The indicators have wide range of applicability: the clients can forecast the quality performance by evaluating the management procedures already during the project instead of waiting until the end of project. The indicator system also provides societal impact as it guides the clients to use the kind of managerial practices that improve the ability to create value in projects that are difficult to evaluate in money terms.,The research provides a novel way to gain a holistic view with analytical indicator tools. The research contributes to lean design management literature by providing insight to the underlying mechanism of beneficial collaboration.

[1]  Burcin Becerik-Gerber,et al.  Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .

[2]  Stephen Emmitt,et al.  Communication behaviour during management and design team meetings: a comparison of group interaction , 2007 .

[3]  Rizal Sebastian Integrated Design and Engineering using Building Information Modelling: A Pilot Project of Small-Scale Housing Development in The Netherlands , 2010 .

[4]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[5]  Daniel Forgues,et al.  Teamwork in Integrated Design Projects: Understanding the Effects of Trust, Conflict, and Collaboration on Performance , 2011 .

[6]  Philip E. T. Lewis,et al.  Research Methods for Business Students , 2006 .

[7]  Gregory Howell,et al.  The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.

[8]  John Smallwood,et al.  Improving construction planning through 4D planning , 2008 .

[9]  Olli Niemi,et al.  Stirring the Construction Project Management with Co-creation and Continuous Improvement , 2015 .

[10]  Sanford J. Grossman,et al.  The Costs and Benefits of Ownership: A Theory of Vertical and Lateral Integration , 1986 .

[11]  O. Hart,et al.  Property Rights and the Nature of the Firm , 1988, Journal of Political Economy.

[12]  Dirk Lindebaum,et al.  A Critical Examination of the Relationship between Emotional Intelligence and Transformational Leadership , 2010 .

[13]  Stephen L. Vargo,et al.  Evolving to a New Dominant Logic for Marketing , 2004 .

[14]  Ossama Salem,et al.  Lean Construction: From Theory to Implementation , 2006 .

[15]  Thomas Kvan,et al.  Collaborative design: what is it? , 2000 .

[16]  Nathan P. Podsakoff,et al.  The Role of Formative Measurement Models in Strategic Management Research: Review, Critique, and Implications for Future Research , 2006 .

[17]  Sandra L. Fielden,et al.  ‘It’s good to be angry’: Enacting anger in construction project management to achieve perceived leader effectiveness , 2011 .

[18]  Kemi Adeyeye,et al.  A co‐creation platform for post‐occupancy decision support , 2013 .

[19]  Anjan V. Thakor,et al.  Firms, Contracts and Financial Structures. , 1996 .

[20]  Stephen Emmitt,et al.  Collaborative Design Management , 2013 .

[21]  Anette Lundström,et al.  Case study: developing campus spaces through co-creation , 2016 .

[22]  Theo van der Voordt,et al.  Quality of design and usability: a vetruvian twin , 2009 .

[23]  Stephen Emmitt Lean Design Management , 2011 .

[24]  H. Winklhofer,et al.  Index Construction with Formative Indicators: An Alternative to Scale Development , 2001 .

[25]  Fred Reichheld,et al.  The Ultimate Question: Driving Good Profits and True Growth , 2006 .

[26]  Stephen Emmitt,et al.  Design Team Communication and Design Task Complexity: The Preference for Dialogues , 2008 .

[27]  M. Naaranoja,et al.  Project change stakeholder communication , 2016 .

[28]  C. Prahalad,et al.  The Future of Competition: Co-Creating Unique Value With Customers , 2004 .

[29]  Albert B. Cherns,et al.  Studying the client's role in construction management , 1984 .

[30]  Øyvind Kvalnes,et al.  Living with the Unknown Unknown: Uncertainty in Projects , 2016 .

[31]  Chimay J. Anumba,et al.  Concurrent engineering in construction , 2012 .

[32]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[33]  Jae-Nam Lee,et al.  Vendors' perspectives on trust and control in offshore information systems outsourcing , 2008, Inf. Manag..

[34]  Yan Ning,et al.  Combining formal controls and trust to improve dwelling fit-out project performance: A configurational analysis , 2017 .

[35]  Göran Lindahl,et al.  The innovative workplace: an analytical model focusing on the relationship between spatial and organisational issues , 2004 .

[36]  Peter E.D. Love,et al.  Concurrent Engineering in the Construction Industry , 1997 .

[37]  Joshua Ayarkwa,et al.  An exploration of the choosing by advantages decision system as a user engagement tool in participatory design , 2016 .

[38]  David M. Gann,et al.  Design Quality Indicator as a tool for thinking , 2003 .

[39]  Miyoung Jeong,et al.  Quality function deployment: An extended framework for service quality and customer satisfaction in the hospitality industry , 1998 .

[40]  Mirkka Rekola,et al.  Towards Integrated Design and Delivery Solutions: Pinpointed Challenges of Process Change , 2010 .

[41]  Daniel Forgues,et al.  The influence of a collaborative procurement approach using integrated design in construction on project team performance , 2009 .

[42]  Raja R. A. Issa,et al.  Evaluating industry perceptions of building information modelling (BIM) impact on construction , 2009, J. Inf. Technol. Constr..

[43]  R. Lennox,et al.  Conventional wisdom on measurement: A structural equation perspective. , 1991 .

[44]  Richard L. Daft,et al.  Organizational information requirements, media richness and structural design , 1986 .