Development of waste occurrence level indicator in Vietnam construction industry

Purpose – The purpose of this paper is to evaluate the waste occurrence level in the construction industry. It includes: first, identifying the mean value of frequency of waste occurrence according to respondents’ characteristics; second, identifying the main predictive factors for waste occurrence based on latent relationships between initial waste factors; and third, identifying the waste occurrence-level indicator (WOLI) for the construction industry based on the main waste measurement factors. Design/methodology/approach – A total of 19 waste factors were sorted from the literature review. A structured questionnaire was adopted to carry out the survey. The respondents are professionals who have much experience in construction and management of project. Shapiro-Wilk test of normality, Levene’s test, ANOVA test, and factor analysis technique were used to analyze the collected data. Findings – Frequency of waste occurrence in construction projects is quite high. There was no statistically and practically...

[1]  G. Garas,et al.  Materials Waste in the Egyptian Construction Industry , 2001 .

[2]  Lauri Koskela,et al.  Waste and labor productivity in production planning case Finnish construction industry , 2010 .

[3]  Soo Yong Kim,et al.  Identifying causes for waste factors in high-rise building projects: A survey in Vietnam , 2014 .

[4]  Eric T. T. Wong,et al.  Economic evaluation of materials planning systems for construction , 1997 .

[5]  Luis F. Alarcón Tools for the identification and reduction of waste in construction projects , 1997 .

[6]  Soo-Yong Kim,et al.  Performance measurement of construction firms in developing countries , 2008 .

[7]  Satyanarayana N. Kalidindi,et al.  Waste in Indian Building Construction Projects , 2009 .

[8]  Philip A. Neck,et al.  The Critical Role of Knowledge Management in Achieving and Sustaining Organisational Competitive Advantage , 2009 .

[9]  Lasse Saukkoriipi,et al.  Measurement of waste and productivity in relation to lean thinking , 2007 .

[10]  Nirmal Kumar Acharya,et al.  Investigation of Key Factors to measure on-site Performance of a Construction firm , 2007 .

[11]  Luis F Alarcón Training field personnel to identify waste and improvement opportunities in construction , 1997 .

[12]  Lucio Soibelman,et al.  Material Waste in Building Industry: Main Causes and Prevention , 2002 .

[13]  Low Sui Pheng,et al.  How 'just-in-time' wastages can be quantified: case study of a private condominium project , 1998 .

[14]  M. Shu,et al.  Supplier Evaluation and Selection Criteria in the Construction Industry of Taiwan and Vietnam , 2007 .

[15]  Alfredo Serpell,et al.  Characterization of waste in building construction projects , 1997 .

[16]  Andy Field,et al.  Discovering statistics using SPSS, 2nd ed. , 2005 .

[17]  Carlos T. Formoso,et al.  Method for Waste Control in the Building Industry , 1999 .

[18]  Soo Yong Kim,et al.  Evaluating impact of waste factors on project performance cost in Vietnam , 2014 .

[19]  John Christian,et al.  Effects of Delay Times on Production Rates in Construction , 1995 .

[20]  Michel Greif,et al.  The Visual Factory: Building Participation Through Shared Information , 1991 .

[21]  E. R. Skoyles,et al.  Materials wastage – a misuse of resources , 1976 .

[22]  Lauri Koskela,et al.  Need for Alternative Research Approaches in Construction Management: Case of Delay Studies , 2013 .

[23]  Hjh Jos Brouwers,et al.  Construction Waste: Quantification and Source Evaluation , 1996 .