Time and cost performance of costruction projects in southern and cenrtal regions of penisular Malaysia
暂无分享,去创建一个
Ismail Abdul Rahman | Aftab Hameed Memon | Sasitharan Nagapan | Qadir Bux Alias Imran Latif | Ade Asmi Abdul Azis
[1] Ibnu Abbas Majid. Causes and effect of delays in Aceh construction industry , 2006 .
[2] W. Marsden. I and J , 2012 .
[3] Ismail Abdul Rahman,et al. Time Overrun in Construction Projects from the Perspective of Project Management Consultant (PMC) , 2011 .
[4] Azlan Shah Ali,et al. Cost performance for building construction projects in Klang Valley , 2010 .
[5] Al Tabtabai,et al. Causes For Delays In Construction Projects In Kuwait , 2002 .
[6] Ming Sun,et al. Cost and time control of construction projects: inhibiting factors and mitigating measures in practice , 2010 .
[7] Koleola Tunwase Odusami,et al. Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .
[8] Tien-Choon Toh,et al. Modeling construction cost factors in the Klang Valley area of Malaysia , 2011, 2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA).
[9] Murali Sambasivan,et al. Causes and effects of delays in Malaysian construction industry , 2007 .
[10] A. Omoregie,et al. Infrastructure delays and cost escalation: Causes and effects in Nigeria , 2006 .
[11] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[12] Long Le-Hoai,et al. Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .
[13] Søren L. Buhl,et al. How common and how large are cost overruns in transport infrastructure projects? , 2003 .
[14] Aaas News,et al. Book Reviews , 1893, Buffalo Medical and Surgical Journal.
[15] Paul G. Hoel,et al. Elementary statistics , 1971 .
[16] José M. Cardoso Teixeira,et al. Dealing with cost and time in the Portuguese construction industry , 2007 .
[17] Henry Mwanaki Alinaitwe,et al. Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects , 2013 .
[18] Jacob Cohen. Statistical Power Analysis for the Behavioral Sciences , 1969, The SAGE Encyclopedia of Research Design.
[19] Ismail Abdul Rahman,et al. Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant , 2010 .
[20] Mohan M. Kumaraswamy,et al. Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .
[21] John B. Shoven,et al. I , Edinburgh Medical and Surgical Journal.
[22] P. Lachenbruch. Statistical Power Analysis for the Behavioral Sciences (2nd ed.) , 1989 .