Effects of Building Information Modeling During Construction

Building information modelling (BIM) and 4D modelling have both recently received widespread attention from the architectural, engineering and construction (AEC) industries. Research efforts to date have demonstrated that BIM and 4D technologies are able to provide faster and more effective communication of information between interested project parties and yield improved and innovative solutions stemming from better design along with other benefits. This paper describes the results of research focused on capturing the effects of BIM during the construction phase of the project. Four factors including requests for information, rework, change orders, and schedule compliance are discussed based on personal interviews with contractor employees experienced in the use of BIM. Eight case studies were conducted to explore the effect of BIM during the construction phase with respect of these four factors.

[1]  Oh-Seong Kwon,et al.  A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template , 2013 .

[2]  Kristen Barlish,et al.  How to measure the bene fi ts of BIM — A case study approach , 2012 .

[3]  Arash Shahi,et al.  Onsite 3D marking for construction activity tracking , 2013 .

[4]  Changmin Kim,et al.  Automated construction progress measurement using a 4D building information model and 3D data , 2013 .

[5]  Qiping Shen,et al.  Building Information Modeling-based user activity simulation and evaluation method for improving designer–user communications , 2012 .

[6]  Mustafa Alshawi,et al.  Exploring how information exchanges can be enhanced through cloud BIM , 2012 .

[7]  Douglas E. Chelson The effects of building information modeling on construction site productivity , 2010 .

[8]  Xianguo Wu,et al.  Using nD technology to develop an integrated construction management system for city rail transit construction , 2012 .

[9]  Charles M. Eastman,et al.  Requirements for BIM platforms in the concrete reinforcement supply chain , 2013 .

[10]  Kenneth T. Sullivan,et al.  How To Measure the Benefits of BIM - A Case Study Approach , 2012 .

[11]  Young Sang Cho,et al.  Efficiency analysis of Set-based Design with structural building information modeling (S-BIM) on high-rise building structures , 2012 .

[12]  Dana K. Smith,et al.  Building Information Modeling: A Strategic Implementation Guide for Architects, Engineers, Constructors, and Real Estate Asset Managers , 2009 .

[13]  Kasun Hewage,et al.  Building Information Modeling (BIM) partnering framework for public construction projects , 2013 .

[14]  Charles M. Eastman,et al.  Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .

[15]  Chris Harty,et al.  Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project , 2013 .

[16]  Mehul Bhatt,et al.  Architecture, computing, and design assistance☆ , 2013 .