Splittable order planning problem with consideration of changeover costs
暂无分享,去创建一个
[1] Lixin Tang,et al. A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex , 2000, Eur. J. Oper. Res..
[2] Bo Zhang,et al. Capacity assignment of the production lines with consideration of equilibrium requirement in iron & steel complex , 2014, 2014 IEEE International Conference on System Science and Engineering (ICSSE).
[3] Li Tie-ke. Batch planning and scheduling method for cold rolling production line , 2006 .
[4] Michel Gendreau,et al. The hot strip mill production scheduling problem: A tabu search approach , 1998, Eur. J. Oper. Res..
[5] Zhi-Long Chen,et al. Integrated Charge Batching and Casting Width Selection at Baosteel , 2014, Oper. Res..
[6] Lixin Tang,et al. An Improved Differential Evolution Algorithm for Practical Dynamic Scheduling in Steelmaking-Continuous Casting Production , 2014, IEEE Transactions on Evolutionary Computation.
[7] Lixin Tang,et al. A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex , 2007, Eur. J. Oper. Res..