A joint bottom-up solution methodology for system-level pavement rehabilitation and reconstruction

We present a methodology for the joint optimization of rehabilitation and reconstruction activities for heterogeneous pavement systems under multiple budget constraints. The proposed bottom-up approach adopts an augmented condition state to account for the history-dependent properties of pavement deterioration, and solves for steady-state policies for an infinite horizon. Genetic algorithms (GAs) are implemented in the system-level optimization based on segment-specific optimization results. The complexity of the proposed algorithm is polynomial in the size of the system and the policy-related parameters. We provide graphical presentations of the optimal solutions for various budget situations. As a case study, a subset of California’s highway system is analyzed. The case study results demonstrate the economic benefit of a combined rehabilitation and reconstruction budget compared to separate budgets.

[1]  Kamran Majidzadeh,et al.  APPLICATION OF MARKOV DECISION PROCESS TO LEVEL-OF-SERVICE-BASED MAINTENANCE SYSTEMS , 1991 .

[2]  Samer Madanat,et al.  A bottom-up solution for the multi-facility optimal pavement resurfacing problem , 2011 .

[3]  T. Friesz,et al.  A model of optimal transport maintenance with demand responsiveness , 1979 .

[4]  Samer Madanat,et al.  A steady-state solution for the optimal pavement resurfacing problem , 2002 .

[5]  Samer Madanat,et al.  Optimization of Infrastructure Systems Maintenance and Improvement Policies , 1999 .

[6]  Moshe E. Ben-Akiva,et al.  Optimal Inspection and Repair Policies for Infrastructure Facilities , 1994, Transp. Sci..

[7]  Yanfeng Ouyang,et al.  Joint Optimization of Pavement Maintenance and Resurfacing Planning , 2012 .

[8]  Kumares C. Sinha,et al.  APPLICATION OF DYNAMIC PROGRAMMING AND OTHER MATHEMATICAL TECHNIQUES TO PAVEMENT MANAGEMENT SYSTEMS , 1988 .

[9]  M E Nunn,et al.  DESIGN OF LONG-LIFE FLEXIBLE PAVEMENTS FOR HEAVY TRAFFIC , 1997 .

[10]  James V. Carnahan Analytical Framework for Optimizing Pavement Maintenance , 1988 .

[11]  Toshihide Ibaraki,et al.  Resource allocation problems - algorithmic approaches , 1988, MIT Press series in the foundations of computing.

[12]  Weng Tat Chan,et al.  GENETIC-ALGORITHM PROGRAMMING OF ROAD MAINTENANCE AND REHABILITATION , 1996 .

[13]  Samer Madanat,et al.  Economically and environmentally informed policy for road resurfacing: tradeoffs between costs and greenhouse gas emissions , 2014 .

[14]  Pablo Luis Durango-Cohen,et al.  Capturing Interdependencies and Heterogeneity in the Management of Multifacility Transportation Infrastructure Systems , 2007 .

[15]  Samer Madanat,et al.  A bottom-up optimal pavement resurfacing solution approach for large-scale networks , 2012 .

[16]  Joseph L. Schofer,et al.  Trend curve optimal control model for highway pavement maintenance: Case study and evaluation , 1994 .

[17]  Michael J Markow,et al.  OPTIMAL REHABILITATION FREQUENCIES FOR HIGHWAY PAVEMENTS , 1985 .

[18]  James C. Chu,et al.  Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions , 2012 .

[19]  Hwasoo Yeo,et al.  Algorithms for bottom-up maintenance optimisation for heterogeneous infrastructure systems , 2013 .

[20]  Mohammad Mamunur Rashid,et al.  Trend Curve Optimal Control Model for Optimizing Pavement Maintenance Strategies Consisting of Various Treatments , 2012, Comput. Aided Civ. Infrastructure Eng..

[21]  Jinwoo Lee,et al.  Jointly optimal policies for pavement maintenance, resurfacing and reconstruction , 2015, EURO J. Transp. Logist..

[22]  Charles-Antoine Robelin,et al.  Reliability-Based System-Level Optimization of Bridge Maintenance and Replacement Decisions , 2008, Transp. Sci..

[23]  Samer Madanat,et al.  OPTIMAL REHABILITATION TIMES FOR CONCRETE BRIDGE DECKS , 1993 .

[24]  W D Paterson,et al.  Quantifying the effectiveness of pavement maintenance and rehabilitation , 1990 .

[25]  Kiyoshi Kobayashi,et al.  Optimal Repair and Inspection Rules under Uncertainty , 2008 .

[26]  T. Friesz,et al.  Influence of Demand-Quality Interrelationships on Optimal Policies for Stage Construction of Transportation Facilities , 1981 .

[27]  Samer Madanat,et al.  History-Dependent Bridge Deck Maintenance and Replacement Optimization with Markov Decision Processes , 2007 .

[28]  Matthew R. Horrocks,et al.  A multi-year pavement maintenance program using a stochastic simulation-based genetic algorithm approach , 2006 .

[29]  Weng Tat Chan,et al.  ROAD-MAINTENANCE PLANNING USING GENETIC ALGORITHMS. II: ANALYSIS , 1994 .

[30]  Weng Tat Chan,et al.  Road-maintenance planning using genetic algorithms. I: Formulation , 1994 .

[31]  Kamal Golabi,et al.  A Statewide Pavement Management System , 1982 .

[32]  John H. Shortreed,et al.  INVESTMENT PLANNING OF A ROAD LINK , 1978 .

[33]  Samer Madanat Incorporating inspection decisions in pavement management , 1993 .

[34]  Ying Wang,et al.  Genetic Algorithm‐Simulation Methodology for Pavement Maintenance Scheduling , 2004 .

[35]  Yanfeng Ouyang,et al.  An analytical solution for the finite-horizon pavement resurfacing planning problem , 2006 .

[36]  Samer Madanat,et al.  Model Uncertainty and the Management of a System of Infrastructure Facilities , 2005 .

[37]  Samer Madanat,et al.  Joint optimization of pavement design, resurfacing and maintenance strategies with history-dependent deterioration models , 2014 .

[38]  Weng Tat Chan,et al.  ROAD-MAINTENANCE PLANNING USING GENETIC ALGORITHMS.. , 1994 .

[39]  Wayne J. Davis,et al.  Optimal maintenance decisions for pavement management , 1987 .

[40]  Y. Ouyang,et al.  Optimal scheduling of rehabilitation activities for multiple pavement facilities: exact and approximate solutions , 2004 .