Performance analysis of the Chena binary geothermal power plant
暂无分享,去创建一个
[1] Gwen Holdmann,et al. The Chena Hot Springs 400kW Geothermal Power Plant: Experience Gained During the First Year of Operation , 2007 .
[2] M. McLinden,et al. NIST Standard Reference Database 23 - NIST Thermodynamic and Transport Properties REFPROP, Version 7.0 , 2002 .
[3] Nikola Stosic,et al. COST EFFECTIVE SMALL SCALE ORC SYSTEMS FOR POWER RECOVERY FROM LOW GRADE HEAT SOURCES , 2006 .
[4] L. Caretto,et al. HEAT EXCHANGERS , 2007 .
[5] Chi-Chuan Wang,et al. Effect of working fluids on organic Rankine cycle for waste heat recovery , 2004 .
[6] Zhen Lu,et al. Dynamic modeling and simulation of an Organic Rankine Cycle (ORC) system for waste heat recovery , 2008 .
[7] David Reay,et al. Compact Heat Exchangers: Selection, Design and Operation , 2001 .
[8] W. Worek,et al. Optimum design criteria for an Organic Rankine cycle using low-temperature geothermal heat sources , 2007 .