Analysis of measurement uncertainty for contact-less method used to measure the position of catenary contact wire, performed with the use of Monte Carlo method
暂无分享,去创建一个
[1] Adrian W C Shing,et al. Contact Wire Wear Measurement and Data Management , 2006 .
[2] Hiroki Nagasawa,et al. Overhead Contact Line Inspection System by Rail-and-Road Car , 2000 .
[3] S. Fararooy,et al. Review of railway overhead wire geometry measurement systems , 1998 .
[4] S. Borromeo,et al. Automatic systems for wear measurement of contact wire in railways , 2002, IEEE 2002 28th Annual Conference of the Industrial Electronics Society. IECON 02.
[5] Leszek Jarzebowicz,et al. Wavelet transform-based approach to defect identification in railway carbon contact strips. , 2015 .
[6] Rainer Puschmann,et al. Contact Lines for Electric Railways: Planning, Design, Implementation, Maintenance , 2001 .
[7] Jarosław Górski. Non-linear models of structures with random geometric and material imperfactions simulation-based approach , 2006 .
[8] H.Y. Li,et al. Assessment of Switched Communication Network Availability for State Estimation of Distribution Networks With Generation , 2007, IEEE Transactions on Power Delivery.
[9] Qin Li,et al. Calibration of Three CCD Camera Overhead Contact Line Measuring System , 2010, 2010 International Conference on Intelligent Computation Technology and Automation.
[10] H. Hofler,et al. Monitoring and inspecting overhead wires and supporting structures , 2004, IEEE Intelligent Vehicles Symposium, 2004.
[11] M. Modest,et al. Spectral Module for Photon Monte Carlo Calculations in Hypersonic Nonequilibrium Radiation , 2010 .
[12] M. Moretti,et al. ARCHIMEDE - the first European diagnostic train for global monitoring of railway infrastructure , 2004, IEEE Intelligent Vehicles Symposium, 2004.
[13] Mikołaj Bartłomiejczyk,et al. Energy recovery effectiveness in trolleybus transport , 2014 .
[14] Masatoshi Shimizu,et al. Development of Contact-Loss Measuring System Using Ultraviolet Ray Detection , 2009 .
[16] I. Aydin,et al. A new contactless fault diagnosis approach for pantograph-catenary system , 2012, Proceedings of 15th International Conference MECHATRONIKA.
[17] Leszek Jarzebowicz,et al. Analysis of Measurement Errors in Rail Vehicles’ Pantograph Inspection System , 2016 .
[18] Ferruccio Resta,et al. Condition Monitoring of the Railway Line and Overhead Equipment Through Onboard Train Measurement - An Italian Experience , 2006 .
[19] Mehmet Karaköse,et al. Anomaly detection using a modified kernel-based tracking in the pantograph-catenary system , 2015, Expert Syst. Appl..
[20] Masatoshi Shimizu,et al. Features of Contact Wire Wear and Measures for Local Wear on Simple Catenary with Copper-Steel Contact Wire , 2007 .
[21] Luca Sani,et al. Phototube sensor for monitoring the quality of current collection on overhead electrified railways , 2001 .
[22] Hamed Hashemi-Dezaki,et al. Risk management of smart grids based on managed charging of PHEVs and vehicle-to-grid strategy using Monte Carlo simulation , 2015 .
[23] Chun-Lien Su,et al. DISTRIBUTION PROBABILISTIC LOAD FLOW SOLUTION CONSIDERING NETWORK RECONFIGURATION AND VOLTAGE CONTROL DEVICES , 2005 .
[24] Takayuki Usuda. Estimation of Wear and Strain of Contact Wire Using Contact Force of Pantograph , 2007 .
[25] José L. Bernal-Agustín,et al. Optimisation of energy supply at off-grid healthcare facilities using Monte Carlo simulation , 2016 .
[26] Jacek Skibicki. The new version of contact-less method for localisation of catenary contact wire - theoretical assumption , 2013 .
[27] David W. P. Thomas,et al. Probabilistic load flow for distribution systems with wind production using Unscented Transform method , 2011, ISGT 2011.
[28] Václav Dupač,et al. Metody Monte Carlo , 1962 .
[29] Ilhan Aydin,et al. A new approach based on firefly algorithm for vision-based railway overhead inspection system , 2015 .
[30] K. Karwowski,et al. Analiza drgań przewodu jezdnego sieci trakcyjnej w aspekcie oceny jej stanu technicznego , 2015 .