Modeling the repair process of a power distribution system

One remedial action for improving service reliability in a power distribution system is to faster crew response to reduce outage durations. For planning activities, the application of this kind of remedial action requires the modeling of the repair process performed in the power distribution system. Thus, this paper presents a methodology which models the repair process performed in each service territory of a power distribution system using concepts of queuing theory and stochastic point processes and assesses the repair process performance by means of a procedure of sequential Monte Carlo simulation. Results of the application of this methodology to three power distribution systems show: 1. The input and service of the repair process model are not necessarily homogeneous Poisson processes; thus the Monte Carlo simulation method is required for the assessment of the repair process performance. 2. The index that better reflect the repair process performance is the mean waiting time. This methodology gives a base for the optimal scheduling of the repair resources in accordance with the failure process and the targets for reliability indices.

[1]  Christos Douligeris,et al.  An integrated framework for managing emergency-response logistics: the case of the electric utility companies , 1998 .

[2]  Uday Kumar,et al.  Goodness-of-fit tests for the power-law process based on the TTT-plot , 1992 .

[3]  C. J. Zapata,et al.  Repair models of power distribution components , 2008, 2008 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America.

[4]  Peng Wang,et al.  Teaching distribution system reliability evaluation using Monte Carlo simulation , 1999 .

[5]  Larry H. Crow,et al.  Evaluating the reliability of repairable systems , 1990, Annual Proceedings on Reliability and Maintainability Symposium.

[6]  Ron Allan,et al.  Sequential probabilistic methods for power system operation and planning , 1998 .

[7]  Magdy M. A. Salama,et al.  Resistance formulas of grounding systems in two-layer earth , 1996 .

[8]  Peng Wang,et al.  Repairable systems reliability trend tests and evaluation , 2005, Annual Reliability and Maintainability Symposium, 2005. Proceedings..

[9]  Richard Brown,et al.  Electric Power Distribution Reliability, Second Edition , 2008 .

[10]  N. Balijepalli,et al.  Modeling and analysis of distribution reliability indices , 2004, IEEE Transactions on Power Delivery.

[11]  Asit P. Basu,et al.  Statistical Methods for the Reliability of Repairable Systems , 2000 .

[12]  Mo-Yuen Chow,et al.  Time of outage restoration analysis in distribution systems , 1996 .

[13]  L. Rolfseng,et al.  The economic aspect of reliability in distribution system planning , 1990 .

[14]  Hassan Zahedi,et al.  Repairable Systems Reliability: Modeling, Inference, Misconceptions and Their Causes , 1989 .

[15]  Harold E. Ascher Repairable Systems Reliability , 2008 .

[16]  O. Gaudoin CPIT goodness-of-fit tests for the power-law process , 1998 .

[17]  C. K. Hansen,et al.  Spurious exponentiality observed when incorrectly fitting a distribution to nonstationary data , 1998 .

[18]  K. Sand,et al.  RELRAD-an analytical approach for distribution system reliability assessment , 1991, Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference.