Cancelling ore pillars in large-scale coastal gold deposit: A case study in Sanshandao gold mine, China

Abstract According to the actual conditions in Sanshandao Gold Mine, the cancelling ore pillars mining method was researched. Firstly, a series of tests for the physical and mechanical characteristics of rock mass were carried out and a quality classification system of rock mass applied in coastal metal deposit was established. Secondly, the reasonable demarcation depth of cancelling ore pillars was simulated using the finite element method, and the simulation results show that the ore pillars can be cancelled below the level of −555 m. Thirdly, a novel layer-backfill mining method of room-pillar alternation was designed to reduce the disturbance and settlement of terrain in mining area. Engineering practice shows that the new mining method enhanced the mining output and relieved rock disturbance. Furthermore, the settlement of the roof strata was small and no disaster occurred. The new mining technology effectively controlled the deformation of the terrain, indicating that the mining of the large-scale gold coastal deposit in Sanshandao Gold Mine was achieved safely, efficiently, and with a low loss rate.

[1]  John-Paul Latham,et al.  Rock quality, durability and service life prediction of armourstone , 2006 .

[2]  Qing Wang,et al.  Dynamic phase-mining optimization in open-pit metal mines , 2010 .

[3]  Jian Deng,et al.  Analysis of factors and countermeasures of mining subsidence in Kaiyang Phosphorus Mine , 2006 .

[4]  Jin S. Chung,et al.  Advance in deep-ocean mining systems research , 1994 .

[5]  Wengang Dang,et al.  Rock quality classification and stability evaluation of undersea deposit based on M-IRMR , 2014 .

[6]  Hu Xiao-rong Unified strength theory and its application in elasto-plastic analysis to tunnel , 2002 .

[7]  Luciana Orlando,et al.  Semiquantitative evaluation of massive rock quality using ground penetrating radar , 2003 .

[8]  Wengang Dang,et al.  Undersea safety mining of the large gold deposit in Xinli District of Sanshandao Gold Mine , 2012, International Journal of Minerals, Metallurgy, and Materials.

[9]  Li Xibing,et al.  Safe mining technology of undersea metal mine , 2012 .

[10]  Lei Dong,et al.  Optimization model of unascertained measurement for underground mining method selection and its application , 2010 .

[11]  P. Rona Resources of the Sea Floor , 2003, Science.

[12]  Hehua Zhu,et al.  Pillar design by combining finite element methods, neural networks and reliability: a case study of the Feng Huangshan copper mine, China , 2003 .

[13]  D. R. Tesarik,et al.  Long-term stability of a backfilled room-and-pillar test section at the Buick Mine, Missouri, USA , 2009 .

[14]  Liu Zhi-xiang,et al.  Chaotic time series reconstruction and security alarm system of rock mass deformation in undersea mining , 2010 .

[15]  Yu-Yong Jiao,et al.  Simulation of failure process of jointed rock , 2008 .

[16]  Chao Liu,et al.  Laws of strata energy release and corresponding safety warning system in metal mine , 2011 .

[17]  Jin S. Chung Deep-Ocean Mining: Technologies For Manganese Nodules And Crusts , 1996 .

[18]  王青,et al.  Dynamic phase-mining optimization in open-pit metal mines , 2010 .

[19]  Zhang Qinli,et al.  Mining method choice based on AHP and fuzzy mathematics , 2008 .

[20]  Wei Zhang,et al.  Stability classification model of mine-lane surrounding rock based on distance discriminant analysis method , 2008 .

[21]  Xibing Li,et al.  Settlement behavior of coal mine waste in different surrounding rock conditions , 2008 .

[22]  Yong Xue-yan Optimization of mining methods based on combination of principal component analysis and neural networks , 2010 .

[23]  Xibing Li,et al.  Chaotic time series prediction for surrounding rock’s deformation of deep mine lanes in soft rock , 2008 .