Analysis of deployment of control power in the Netherlands

Since the liberalization of the Dutch electricity market in 1998, duties and interests of market players changed from minimizing overall costs to maximizing individual profits. Naturally, this has an effect on their behavior. After the introduction of the imbalance settlement system by the transmission system operator in 2001, deployment of control power has changed over time. This paper analyses this deployment of control power to examine the behavior of market players. From the analysis it can be concluded that costs for imbalance settlement are increasing over the years. It is getting ever more difficult for new market players that have only uncontrollable renewable generation to enter the market.

[1]  I. G. Kamphuis Massive coordination of residential embedded electricity generation and demand response using the PowerMatcher approach , 2007 .

[2]  J. Frunt,et al.  Effects of Further Integration of Distributed Generation on the Electricity Market , 2006, Proceedings of the 41st International Universities Power Engineering Conference.

[3]  Harry Singh,et al.  On the various design options for ancillary services markets , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.

[4]  W.L. Kling,et al.  System integration of large-scale wind power in the Netherlands , 2006, 2006 IEEE Power Engineering Society General Meeting.

[5]  W.L. Kling,et al.  Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch , 2007, IEEE Transactions on Energy Conversion.

[6]  Madeleine Gibescu,et al.  Integration of wind power in the liberalized Dutch electricity market , 2006 .