A cycle time optimization model for generating stable periodic railway timetables
暂无分享,去创建一个
[1] Paolo Toth,et al. Nominal and robust train timetabling problems , 2012, Eur. J. Oper. Res..
[2] Matteo Fischetti,et al. A Lagrangian Heuristic for Robustness, with an Application to Train Timetabling , 2012, Transp. Sci..
[3] Janny Leung,et al. Optimizing Timetable Synchronization for Rail Mass Transit , 2008, Transp. Sci..
[4] Geert Jan Olsder,et al. Max Plus at Work: Modeling and Analysis of Synchronized Systems: A Course on Max-Plus Algebra and Its Applications , 2005 .
[5] Steffen Hölldobler,et al. Solving Periodic Event Scheduling Problems with SAT , 2012, IEA/AIE.
[6] I. Schuele,et al. Synchronization of Regional Public Transport Systems , 2009 .
[7] Erhan Kozan,et al. Techniques to effectively buffer schedules in the face of uncertainties , 2015, Comput. Ind. Eng..
[8] Ingo A. Hansen,et al. Performance indicators for railway timetables , 2013, 2013 IEEE International Conference on Intelligent Rail Transportation Proceedings.
[9] Tobias Lindner. Applicability of the analytical UIC Code 406 compression method for evaluating line and station capacity , 2011, J. Rail Transp. Plan. Manag..
[10] Michiel A. Odijk,et al. A CONSTRAINT GENERATION ALGORITHM FOR THE CONSTRUCTION OF PERIODIC RAILWAY TIMETABLES , 1996 .
[11] Daniel Sparing,et al. An optimization model for periodic timetable generation with dynamic frequencies , 2013, 16th International IEEE Conference on Intelligent Transportation Systems (ITSC 2013).
[12] Matthias Ehrgott,et al. Routing Trains Through Railway Junctions: A New Set-Packing Approach , 2011, Transp. Sci..
[13] Rolf H. Möhring,et al. The Concept of Recoverable Robustness, Linear Programming Recovery, and Railway Applications , 2009, Robust and Online Large-Scale Optimization.
[14] K. Nachtigall,et al. Periodic Network Optimization with Different Arc Frequencies , 1996, Discret. Appl. Math..
[15] Paolo Toth,et al. Solution of the Train Platforming Problem , 2011, Transp. Sci..
[16] Alexander Schrijver. Routing and timetabling by topological search , 1998 .
[17] Rob M.P. Goverde,et al. A delay propagation algorithm for large-scale railway traffic networks , 2010 .
[18] K. Nachtigall,et al. Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracks , 1997 .
[19] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[20] Lorenzo Mussone,et al. An analytical approach to calculate the capacity of a railway system , 2013, Eur. J. Oper. Res..
[21] Hayriye Ayhan,et al. A probabilistic (max, +) approach for determining railway infrastructure capacity , 2003, Eur. J. Oper. Res..
[22] Matthew E. H. Petering,et al. Mixed-Integer Programming for Railway Capacity Analysis and Cyclic, Combined Train Timetabling and Platforming , 2016, Transp. Sci..
[23] Rommert Dekker,et al. Stochastic Improvement of Cyclic Railway Timetables , 2006 .
[24] Rob M.P. Goverde,et al. Railway Timetable Stability Analysis Using Max-plus System Theory , 2007 .
[25] Uwe T. Zimmermann,et al. Cost optimal periodic train scheduling , 2005, Math. Methods Oper. Res..
[26] Christian Liebchen,et al. The First Optimized Railway Timetable in Practice , 2008, Transp. Sci..
[27] Paolo Toth,et al. A three-level framework for performance-based railway timetabling , 2015 .
[28] Rob M.P. Goverde,et al. An integrated micro–macro approach to robust railway timetabling , 2016 .
[29] Sebastian Stiller,et al. Computing delay resistant railway timetables , 2010, Comput. Oper. Res..
[30] Dennis Huisman,et al. Delay Management with Rerouting of Passengers , 2012, Transp. Sci..
[31] Matteo Fischetti,et al. Fast Approaches to Improve the Robustness of a Railway Timetable , 2009, Transp. Sci..
[32] Dennis Huisman,et al. The New Dutch Timetable: The OR Revolution , 2008, Interfaces.
[33] L. C. Thomas,et al. Model Building in Mathematical Programming (2nd Edition) , 1986 .
[34] Matteo Fischetti,et al. Light Robustness , 2009, Robust and Online Large-Scale Optimization.
[35] Matthew E. H. Petering,et al. Mixed integer programming for minimizing the period of a cyclic railway timetable for a single track with two train types , 2013, Comput. Ind. Eng..
[36] R.M.P. Goverde,et al. IMPROVING PUNCTUALITY AND TRANSFER RELIABILITY BY RAILWAY TIMETABLE OPTIMIZATION , 1999 .
[37] Paolo Toth,et al. Scheduling extra freight trains on railway networks , 2010 .
[38] Leo Liberti,et al. Automatic Generation of Symmetry-Breaking Constraints , 2008, COCOA.
[39] Karl Nachtigall,et al. A genetic algorithm approach to periodic railway synchronization , 1996, Comput. Oper. Res..
[40] Jurjen S. Hooghiemstra,et al. The use of simulation in the planning of the Dutch railway services , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[41] D. R. Bergmann. INTEGER PROGRAMMING FORMULATION FOR DERIVING MINIMUM DISPATCH INTERVALS ON A GUIDEWAY ACCOMMODATING THROUGH AND LOCAL PUBLIC TRANSPORTATION SERVICES , 1974 .
[42] Walter Ukovich,et al. A Mathematical Model for Periodic Scheduling Problems , 1989, SIAM J. Discret. Math..
[43] Leo G. Kroon,et al. A Variable Trip Time Model for Cyclic Railway Timetabling , 2003, Transp. Sci..
[44] Fabián A. Chudak,et al. Design of a Railway Scheduling Model for Dense Services , 2009 .