Efficiency consideration of generalized age replacement policy

[1]  Dong Ho Park,et al.  Optimal post-warranty maintenance policy with repair time threshold for minimal repair , 2013, Reliab. Eng. Syst. Saf..

[2]  Dong Ho Park,et al.  A Generalized Age Replacement Policy for Systems Under Renewing Repair-Replacement Warranty , 2016, IEEE Transactions on Reliability.

[3]  Shey-Huei Sheu,et al.  Optimal age-replacement policy of a system subject to shocks with random lead-time , 2004, Eur. J. Oper. Res..

[4]  Gregory Levitin,et al.  Element maintenance and allocation for linear consecutively connected systems , 2012 .

[5]  Ruey-Huei Yeh,et al.  Optimal age-replacement policy for nonrepairable products under renewing free-replacement warranty , 2005, IEEE Transactions on Reliability.

[6]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[7]  C. Tilquin,et al.  The Age Replacement Problem with Minimal Repair and Random Repair Costs , 1979, Oper. Res..

[8]  Tom Chen,et al.  Maintenance policies with two-dimensional warranty , 2002, Reliab. Eng. Syst. Saf..

[9]  D. N. Prabhakar Murthy,et al.  A new repair-replace strategy for items sold with a two-dimensional warranty , 2005, Comput. Oper. Res..

[10]  Min Jung,et al.  Analysis of field data under two-dimensional warranty , 2007, Reliab. Eng. Syst. Saf..

[11]  Dong Ho Park,et al.  Optimal maintenance strategy under renewable warranty with repair time threshold , 2017 .

[12]  Yu-Hung Chien Optimal Age-Replacement Policy Under an Imperfect Renewing Free-Replacement Warranty , 2008, IEEE Transactions on Reliability.

[13]  Rui Peng,et al.  Age-Based Replacement Policy With Consideration of Production Wait Time , 2016, IEEE Transactions on Reliability.