We consider the single-machine problem of scheduling n jobs to minimize the total weighted deviation from a given common due date where the weights for early and tardy completion are asymmetric. First, we assume that the common due date is large. We formulate this problem as an integer linear program with an exponential number of variables and present a column generation algorithm to solve efficiently the linear programming relaxation. Our comprehensive computational study shows that this lower bounding approach performs exceptionally well on randomly generated instances: the solution to the linear program was integral for all randomly generated instances. In this fashion we were able to solve instances with up to 60 jobs. Our computational results suggest that the integrality of the optimal solution of the linear programming relaxation is a structural property. We show by example that the integrality gap can be positive however. To start up the column generation algorithm we need a heuristic to generate reasonably good solutions. A simple multi-start iterative improvement algorithm turned out to have a compelling empirical performance: it found an optimal solution for each of our randomly generated instances. We conclude with showing how the column generation approach can be adapted to deal with a small common due date.
[1]
Han Hoogeveen,et al.
Parallel Machine Scheduling by Column Generation
,
1999,
Oper. Res..
[2]
J. A. Hoogeveen,et al.
Scheduling around a small common due date
,
1991
.
[3]
M. Quaddus.
A Generalized Model of Optimal Due-Date Assignment by Linear Programming
,
1987
.
[4]
Han Hoogeveen,et al.
New Lower and Upper Bounds for Scheduling Around a Small Common Due Date
,
1994,
Oper. Res..
[5]
Gary D. Scudder,et al.
On the Assignment of Optimal Due Dates
,
1989
.
[6]
P. De,et al.
Solving a generalized model for CON due date assignment and sequencing
,
1994
.
[7]
Gary D. Scudder,et al.
Sequencing with Earliness and Tardiness Penalties: A Review
,
1990,
Oper. Res..
[8]
Marc E. Posner,et al.
Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
,
1991,
Oper. Res..