습지여상시설을 이용한 하천 수질정화
暂无分享,去创建一个
The facility of constructed wet land combined with filter media was examined in order to improve the water quality of a polluted stream, which has been performed as a part of national projects. Throughout 2 years of operation for a stream, it can provide the design and operating parameters for the purpose of future construction. The influent flow rate was about 50% against the design capacity. The removal efficiencies of BOD, COD(Mn), SS, T-N and T-P were 62.9%, 47.1%, 74.8%, 22.4% and 33.5%, respectively. In order to keep this facility stable, the removal of surface filter media and supplement should be periodically conducted. In addition, the proper selection of sites is recommended not to be flooded.