Critical construction conflicting factors identification using analytical hierarchy process

The construction industry is dynamic in nature due to increase in uncertainties in technology, budgets, and development processes. Claims and litigation are on a dramatic rise throughout the construction industry. If disputes are not resolved promptly, they tend to drag on and escalate and can cause project delays, lead to claims, require litigation proceedings for resolution, and ultimately destroy business relationships. The purpose of this study is to find out the magnitude of the identified six major construction conflicting factors and responsible parties for those problems. Out of six identified conflicting factors, this study has detected four major factors contributing construction conflict using AHP tool. These four major contributors are: ‘change of site condition’, ‘people interruptions’, ‘change order evaluation’, and ‘defective design’. The survey has also revealed the owner as a more responsible party for these conflicting factors and then followed by the consultant. The paper has suggested taking lead role by the owner to man age the conflicts in the construction sites and driving the project toward accomplishment by best planning. A construction conflict prevention model (CCPM) is suggested.

[1]  Roger Miller,et al.  Understanding and Managing Risks in Large Engineering Projects , 2001 .

[2]  K Acharya Nirmal,et al.  Conflicting Factors in Korean Construction Industry , 2006 .

[3]  Thomas S. Slater FEATURE: Partnering: Agreeing to Agree , 1998 .

[4]  Kathleen M. J. Harmon,et al.  Resolution of Construction Disputes: A Review of Current Methodologies , 2003 .

[5]  Ju Taek Oh,et al.  Development of severity models for vehicle accident injuries for signalized intersections in rural areas , 2006 .

[6]  Stephen O. Ogunlana,et al.  The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study , 2002 .

[7]  Sai On Cheung,et al.  Fundamentals of Alternative Dispute Resolution Processes in Construction , 2002 .

[8]  Alexandra Zetlin,et al.  THE PUBLIC: KEY TO SUCCESSFUL PROJECTS , 2003 .

[9]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[10]  Edward R. Fisk Construction Project Administration , 1978 .

[11]  Edwin H.W. Chan,et al.  Disputes and Dispute Resolution Systems in Sino-Foreign Joint Venture Construction Projects in China , 2005 .

[12]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[13]  Sidney M. Levy Project Management in Construction , 1987 .

[14]  Lee Young-Dai,et al.  Conflict Avoidance in Construction Projects: Six 'C' Rescue Factors , 2005 .

[15]  Qian Wang,et al.  Priority setting in maintenance management: a modified multi-attribute approach using analytic hierarchy process , 1998 .

[16]  Boyd C. Paulson,et al.  Professional Construction Management , 1978 .

[17]  Mohan M. Kumaraswamy,et al.  Contracting Relationship Trends and Transitions , 2004 .

[18]  Michael R. Finke A Better Way to Estimate and Mitigate Disruption , 1998 .

[19]  Luiz Moutinho,et al.  Analytical hierarchy process , 1994 .

[20]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[21]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[22]  N. Kartam,et al.  Risk and its management in the Kuwaiti construction industry: a contractors’ perspective , 2001 .