A genetic algorithm for solving a fuzzy economic lot-size scheduling problem
暂无分享,去创建一个
Ping-Teng Chang | Ming-Jong Yao | Ping-Teng Chang | Ming-Jong Yao | Shih-Fen Huang | Chia-Tsung Chen | Shih-Fen Huang | Chia-Tsung Chen
[1] Huey-Ming Lee,et al. Economic production quantity for fuzzy demand quantity, and fuzzy production quantity , 1998, Eur. J. Oper. Res..
[2] S. H. Arcade. Single machine multi-product batch scheduling: Testing several solution methods , 1993 .
[3] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[4] J. Grznar,et al. An optimal algorithm for the basic period approach to the economic lot scheduling problem , 1997 .
[5] K. S. Park,et al. Fuzzy-set theoretic interpretation of economic order quantity , 1987, IEEE Transactions on Systems, Man, and Cybernetics.
[6] R. W. Haessler. An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem , 1979 .
[7] W. Hsu. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .
[8] Jing-Shing Yao,et al. Fuzzy inventory with backorder for fuzzy total demand based on interval-valued fuzzy set , 2000, Eur. J. Oper. Res..
[9] Manoranjan Maiti,et al. A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity , 1997 .
[10] Ping-Teng Chang,et al. On the Economic Lot Scheduling Problem with Fuzzy Demands , 2005 .
[11] Ping-Teng Chang,et al. Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach , 2001, Int. J. Comput. Integr. Manuf..
[12] Fayez F. Boctor. The G-group heuristic for single machine lot scheduling , 1987 .
[13] Didier Dubois,et al. Fuzzy sets and systems ' . Theory and applications , 2007 .
[14] San-Chyi Chang,et al. Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number , 1999, Fuzzy Sets Syst..
[15] Huey-Ming Lee,et al. Fuzzy inventory with or without backorder for fuzzy order quantity with trapezoid fuzzy number , 1999, Fuzzy Sets Syst..
[16] Kyung S. Park,et al. A Stepwise partial enumeration algorithm for the economic lot scheduling problem , 1984 .
[17] S. Fujita. The Application of Marginal Analysis to the Economic Lot Scheduling Problem , 1978 .
[18] Radivoj Petrovic,et al. EOQ formula when inventory cost is fuzzy , 1996 .
[19] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[20] E. Lee,et al. Ranking of fuzzy sets based on the concept of existence , 1994 .
[21] Zbigniew Michalewicz,et al. Genetic Algorithms + Data Structures = Evolution Programs , 1996, Springer Berlin Heidelberg.
[22] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .
[23] Jing-Shing Yao,et al. Fuzzy economic production for production inventory , 2000, Fuzzy Sets Syst..
[24] Zbigniew Michalewicz,et al. The use of genetic algorithms to solve the economic lot size scheduling problem , 1998, Eur. J. Oper. Res..
[25] Brian G. Kingsman,et al. The economic lot scheduling problem: theory and practice , 1991 .
[26] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .